My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 17 - <br /> Executive Order VR-202-D <br /> Healy Phase II EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> Figure 28-5 <br /> Typical Installation of a Three PN Vent Valve Parallel Manifold <br /> with Healy Clean Air Separator <br /> (This configuration requires additional P/V vent valves that are not supplied in the Healy installation kit) <br /> VENT VALVES <br /> (SUPPLIED BY INSTALLER) <br /> AIR BREATHER <br /> --MINIMUM SLOPE ASSEMBLY <br /> 1/8" PER =00T, P/N 9948 <br /> 100 FT. MAX, 12' MINIMUM <br /> LENGTH ABOVE GRADE <br /> FLOAT CHECK <br /> VALVE F <br /> P/N 9466G A <br /> OVERFILL PLUG <br /> PROTECTON <br /> BALL VALVE <br /> LOCKED OPEN <br /> DORS 0 <br /> IN NORMAL <br /> OPERATION �\ �i VAPOR <br /> BALL VALVES `�` Al <br /> LOCKED CLOSED <br /> I I � <br /> OR <br /> I <br /> IN NORMAL <br /> OPERATION I fi ` <br /> B C <br /> ' 4 i <br /> BALL VALVE <br /> 9FL IOyC�K�E1D CLOSED <br /> LJ OR� p <br /> IN NORMAL �I ' <br /> OPERATION ' II <br /> 2 <br /> PLUG D <br /> r�r�-rtT-iTr I I <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.