My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -4- <br /> 5.4 Stopwatch <br /> Use a stopwatch accurate to within 0.2 seconds. <br /> 5.5 Flow Meter <br /> Use a flow meter to determine the required pressure setting of the delivery <br /> pressure gauge on the nitrogen supply pressure regulator. This pressure shall be <br /> set such that the nitrogen flow rate is between 2.0 CFM (120 CFH) and 4.0 CFM <br /> (240 CFH). <br /> 5.6 Leak Detection Solution <br /> Any liquid solution designed to detect vapor leaks may be used to verify the <br /> pressure integrity of the test equipment prior to conducting the test. <br /> 5.7 Condensate Collection Vessel <br /> A container approved for use with gasoline that can hold at least a half gallon of <br /> material. <br /> 5.8 Graduated Cylinder <br /> A graduated cylinder suitable for use with gasoline capable of measuring to the <br /> nearest ounce or mL. <br /> 6 PRE-TEST PROCEDURES <br /> 6.1 The following safety precautions shall be followed: <br /> 6.1.1 Only gaseous nitrogen shall be used to pressurize the system. <br /> 6.1.2 An 8 oz. pressure relieve valve shall be installed on the Test Port Assembly to <br /> prevent the possible over-pressurizing of the Clean Air Separator. <br /> 6.1.3 A ground strap should be employed during the introduction of nitrogen into the <br /> system. <br /> 6.2 There shall be no Phase I bulk product deliveries into or out of the gasoline <br /> storage tank(s) within the three (3) hours prior to the test or during the <br /> performance of this test procedure. <br /> 6.3 All pressure measuring device(s) shall be bench calibrated using a reference <br /> standard. Calibration shall be performed at 20, 50, and 80 percent of full <br /> scale. Accuracy shall be within two percent at each of these calibration points. <br /> Calibrations shall be conducted on a frequency not to exceed 180 days. <br /> Calibration documentation shall be maintained with the equipment at all times. <br /> Healy Clean Air Separator Test Procedure, Exhibit 4—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.