My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 8 <br /> 6.8 ' Installing the Test Port Assembly <br /> 6.8.1 Open the ball valve marked "B", shown in Figure 1 or Figure 1 H. This ensures <br /> that if there is any condensate in the primary connection line to the Clean Air <br /> Separator it will drop down into the lower section of the piping configuration, so <br /> that it can be measured. Close the valve after approximately 30 seconds. <br /> 6.8.2 Position the condensate collection vessel below plug "E" prior to removing it. <br /> Remove the 1" plugs from locations "E" and "F" from Figure 1 or Figure 1H. <br /> Transfer the collected condensate into the graduated cylinder. If there is more <br /> than 16 oz. (473 mL) of liquid condensate, the bladder and vapor processor <br /> vessel must be drained. Conduct the bladder and vessel draining procedures <br /> from the Clean Air Separator section of the ARB Approved Installation, <br /> Operation and Maintenance Manual. <br /> Note: Depending upon the size of the graduated cylinder and the amount <br /> of condensate, it may take multiple transfers from the condensate collection <br /> vessel to get the total condensate measurement. <br /> 6.8.3 Install the Test Port Assembly to the Clean Air Separator at location "E". See <br /> Figure 2 or Figure 2H. Figure 2 applies to vertical CAS installations and <br /> Figure 2H applies to horizontal CAS installations. <br /> 6.8.4 Connect the gaseous nitrogen supply to the Test Port Assembly. See <br /> Figure 2 or Figure 2H. <br /> 6.8.5 Check the test equipment and piping isolated from normal Clean Air <br /> Separator operation by the ball valves "B, C and D" by pressurizing with <br /> nitrogen to a pressure of 4" we± 1" we and closing the ball valve on the Test <br /> Port Assembly. Use leak detection solution. Tighten as necessary. The test <br /> equipment shall have no leaks. <br /> 6.8.6 Open the needle valve on the Test Port Assembly to bleed the pressure off <br /> the equipment. Keep ball valve on Test Port Assembly closed. <br /> Healy Clean Air Separator Test Procedure, Exhibit 4—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.