My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -13- • <br /> 7A If the bladder was evaluated using the vacuum procedure (Section 7.2), close <br /> the ball valve "C to keep it in a vacuum condition. If the bladder was evaluated <br /> using the pressure procedure (Section 7.3), open the needle valve on the Test <br /> Port Assembly to bleed off all pressure from the bladder. <br /> 7.5 Close the ball valve marked "C°, if not already done. <br /> 7.6 Remove the Test Port Assembly from location "E" and install the 1" pipe plug. <br /> Use a pipe sealant approved for use with gasoline on the threads and tighten to <br /> 60 ft-lbs. <br /> 7.7 Install the 1" pipe plug to location "F". Use a pipe sealant approved for use with <br /> gasoline on the threads and tighten to 60 ft-lbs. <br /> 7.8 Open the ball valve marked "A". Lock all ball valves using the padlocks. <br /> 7.9 The Clean Air Separator should now be in normal operation configuration. Verify <br /> this by using the outline from Section 6.7 and Figure 1 or Figure 1 H. <br /> 8 REPORTING <br /> 8.1 Record test data on the form shown in Figure 3. Districts may require the use of <br /> an alternate form, provided that the alternate form includes the same minimum <br /> parameters as in Figure 3. <br /> Healy Clean Air Separator Test Procedure, Exhibit 4—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.