Laserfiche WebLink
• -13- • <br /> 7A If the bladder was evaluated using the vacuum procedure (Section 7.2), close <br /> the ball valve "C to keep it in a vacuum condition. If the bladder was evaluated <br /> using the pressure procedure (Section 7.3), open the needle valve on the Test <br /> Port Assembly to bleed off all pressure from the bladder. <br /> 7.5 Close the ball valve marked "C°, if not already done. <br /> 7.6 Remove the Test Port Assembly from location "E" and install the 1" pipe plug. <br /> Use a pipe sealant approved for use with gasoline on the threads and tighten to <br /> 60 ft-lbs. <br /> 7.7 Install the 1" pipe plug to location "F". Use a pipe sealant approved for use with <br /> gasoline on the threads and tighten to 60 ft-lbs. <br /> 7.8 Open the ball valve marked "A". Lock all ball valves using the padlocks. <br /> 7.9 The Clean Air Separator should now be in normal operation configuration. Verify <br /> this by using the outline from Section 6.7 and Figure 1 or Figure 1 H. <br /> 8 REPORTING <br /> 8.1 Record test data on the form shown in Figure 3. Districts may require the use of <br /> an alternate form, provided that the alternate form includes the same minimum <br /> parameters as in Figure 3. <br /> Healy Clean Air Separator Test Procedure, Exhibit 4—Executive Orders VR-201-D and VR-202-D <br />