My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -10- <br /> 6.3 Verify that the O-ring in the V/L adaptor is present and in good condition. An <br /> 0-ring with nicks, tears, or other deformations shall be replaced prior to the <br /> test. The O-ring shall be properly lubricated (see Section 5.7) to ensure a <br /> vapor tight connection. <br /> 6.4 Conduct a pre-test leak check of the V/L adaptor, the gas volume <br /> meter and the adaptor supply hose by connecting the V/L adaptor <br /> to a surrogate spout as shown in Figure 5 and described in Section <br /> 5.11B. Raise the test pressure to 5.00" ± 0.50" WC. There shall not <br /> be a pressure drop of more than 1.00" WC from the above starting <br /> pressure for 30 seconds from the start of the test. If the leak test <br /> passes, proceed with the V/L testing. If the leak test fails, proceed to <br /> isolate the source of the leak by pressurizing the test equipment again. <br /> Squirt liquid leak detector solution on interfaces and other potential <br /> leak sources and watch for the formation of bubbles. Once leak(s) are <br /> repaired, repeat the leak test procedure. <br /> Note: Leak checks shall be conducted in a shaded area or away from <br /> direct sunlight. Leak checks may be conducted during V/L <br /> testing to ensure leak integrity of test equipment. <br /> 6.5 This test procedure shall be conducted with the storage tank <br /> pressure/vacuum (P/V) valve(s) installed and the Phase I vapor coupler(s) <br /> poppet(s) in the closed position with the adaptor dust cap(s) installed. <br /> 6.6 With the portable tank and V/L test equipment assembled, dispense gasoline <br /> into the portable test tank until at least 10% of the tanks total capacity has <br /> been reached. This will condition the portable tank with gasoline vapors. <br /> This conditioning shall be conducted each time the test tank is emptied prior <br /> to conducting testing at each facility. <br /> 6.7 All pressure measuring device(s) shall be bench calibrated using a reference <br /> gauge, incline manometer or NIST traceable standard at least once every six <br /> (6) months. Calibration shall be performed at 20, 50, and 80 percent of full <br /> scale. Accuracy shall be within five (5) percent at each of these calibration <br /> points. <br /> Healy Model 900 Nozzle V/L Test Procedure, Exhibit 5—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.