Laserfiche WebLink
• -14- • <br /> 8. POST-TEST.PROCEDURES <br /> 8.1 Remove the V/L adaptor from the nozzle. <br /> 8.2 Drain the dispensed product into the appropriate gasoline storage tank at the <br /> facility. Ground the portable tank assembly to the storage tank before <br /> draining. Do not mix product grades in the portable tank assembly without <br /> approval of the facility owner and use caution to drain the portable tank into <br /> the correct facility storage tank. If blending valves are utilized to produce <br /> product grades that do not have a dedicated storage tank, product from the <br /> blended grade shall be returned to the lower octane tank. <br /> 8.3 After concluding testing at the facility, perform a post-test leak check of <br /> the V/L adaptor, the gas volume meter and the adaptor supply hose by <br /> connecting the V/L adaptor to a surrogate spout as shown in Figure 5 <br /> and described in Section 5.113, Raise the test pressure to 5.00" ± 0.50" <br /> WC. There shall not be a pressure drop of more than 1.00" WC from <br /> the above starting pressure for 30 seconds from the start of the test. <br /> The data collected during the V/L testing between the last valid test <br /> equipment leak check (see Section 6.4) and the post-test leak check is <br /> invalid if the test equipment fails this post-test leak check. <br /> Note: Leak checks shall be conducted in a shaded area or away from <br /> direct sunlight. <br /> 8.4 Prior to transportation, the inlet and outlet of the gas volume meter shall be <br /> carefully sealed to prevent foreign matter from entering the meter. <br /> 8.5 The Authority Having Jurisdiction (AHJ) may be contacted on the <br /> requirements for storage and transportation of the portable test tank. This <br /> would typically be the local fire department. <br /> Healy Model 900 Nozzle V/LTest Procedure, Exhibit 5—Executive Orders VR-201-D and VR-202-D <br />