My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIT(WING SYSTEM CERTI*ATION <br /> CERTIFICATION / TEST DATE: Jul 27, 2009 <br /> Al. FACILITY A2. OWNER <br /> Name 7-Eleven Market#2368/Store#32190 Name 7-Eleven, Inc <br /> Address 4943 South State Route 99,Stockton,CA 95206 Address P.O. Box 711, Dallas,TX 75221 <br /> Phone# 209-939-0679 Phone# 805-523-2949 <br /> Contact Jay Stemley Contact Shane Partridge <br /> F. IN-TANK GAUGING /SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No Has all input wiring been inspectetl for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes vlaually Inspected for damage and reaidue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ■ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> ■ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off If the LLD detects a leak? <br /> ❑ N/A <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or falls a test? <br /> ■ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> This is a test of the 89 PLLD after replacement. <br /> ©2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.