Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> JP 7ankrK* gy <br /> TEST DATE: 12/15/08 8501 N MOPAC EXPRESSWAY,SUITE 400 <br /> AUSTIN,TEXAS 78759(512)451-6334 WORK ORDER NUMBER: 2262152 <br /> CLIENT: 7-ELEVEN, INC. SITE: 7-ELEVEN #32190(N-3810) , <br /> Tank ID: RUL 4Tank manifolded: No Bottom to top fill in inches: 141.5 <br /> Product: REGULAR Vent manifolded: No Bottom to grade in inches: 152.0 <br /> Capacity in gallons: 14,781 Vapor recovery manifolded: YES Fill pipe length in inches: 51.5 <br /> Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 543 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DN FIBERS Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> 7Tank ,RESULTS --,-Test Method LEAK D1Q ,OR TFC Tesf methodi <br /> SI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> uid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: vseaERRoox <br /> volume in gallons: Model: ELECTRONIC <br /> ter level in inches: S/N: �,cr. :.,a <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: 29 <br /> Specific gravity: NOT <br /> Water table depth in inches: Resiliency cc: TESTED <br /> Determined by(method): est leak rate ml/m: 189.0 <br /> Metering psi: <br /> Leak rate in gph: Calib.leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTest Method:'. 'LINE TEST RESULTS - Test type:-}. <br /> Test time: Material: ENVIRON Ej <br /> Ullage volume: Diameter(in): 1.5 <br /> Ullage pressure: Length (ft): 245.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min): <br /> Time of test 1: Test 1:Start time: <br /> Finish psi: NOT NOT NOT <br /> Temperature: NOT Vol change cc: NOT <br /> TESTED TESTED TESTED <br /> Flow rate(cfh): TESTED Test 2:Start time: TESTED <br /> Finish psi: <br /> Time of test 2: Vol change cc: <br /> Temperature: Test 3:Start time: <br /> Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: UNKNOWN <br /> Printed 12/23/2008 09:21 ACRAMER <br />