Laserfiche WebLink
Underground Storage Tank Monitorinan - Page 2 of 2 <br />VI. DISPENSER MONITORIN=apply) M50.MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWINGMat apply)1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT ( MDCM52.PANEL MANUFACTURER: eederROOMss0-2n8 M54.LEAK SENSOR MANUFACTURE R: Veederl-29- — <br />a. YES ❑ b. NO Mss.WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALA® a. YES ❑ b. NO M56. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES 11b. NO M57. <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEARS VALVE IN CASE OF LEAK M59. <br />ASSEMBLY MANUFACTURER: MODEL #(S): <br />M60. <br />❑ 3.VISUALMONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY(acquir« agency appro <br />❑ 4. NO DISPENSERS M6L <br />❑ 99, OTHER (Specify) <br />VII. ENHANCED LEAK DETE TION M 0. <br />❑ I. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD TH T WE MUST LEMENT ENHANCED LEAK <br />DETECTION (ELD) FOR THE USTI COVERED BY THIS P R23 CCR §2644.11ELD S PERFO D EVERY 36 MONTHS AS REQUIRED <br />VIIL ING <br />M80. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that appl <br />I. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Requ ed) <br />2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPME T (Required) <br />3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of JA nary 1, 2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATI N: "HANDB K FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY REC CILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKL AL TANK GAUGING FOR SMALL DERGROUND STORAGE TANKS" Mgt, <br />99. ❑ OTHER (Specify): <br />Personnel with UST monitoring responsibiliti s are familiar all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005, this facility will have a " signated UST peva l who has passed the California UST Sytem Operator Exam administered by the International <br />Code Council (ICC). By July I, 2005, and an natty thereafter, t e "Designated UST Operator" will train facility employees in the proper operation and maintenance <br />of the UST systems. This training will include, ut is not limited t , the following: <br />➢ Operation of the UST systems in a mann r consistent with a facility's best management practices. <br />➢ The facility emplo e's role with regard the leak detecti n equipment. <br />• The facility employ 's role with regard t spills and ov Is. <br />➢ Whom to contact for mergencies and leak ketection ala <br />For facility employees hired n or atter July 1, 200 the initial ining will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION MBS. <br />Please use this section to includ any additional UST system monitoring -related information (e.g., additional information requireby d your local agency): <br />Note regarding Section X. Pe ing certification of a Designated UST Operator, the following person has authority for performing the monitoring <br />activities and maintaining leak lection equipment covered by this plan. NAME: <br />JOB TITLE: <br />X, PERSONNEL RESPONSIBILITIES <br />AS OF JANUARY 1, 20 THE "DES NATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br />APPLICATION — FACILITY RM WIL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br />LEAK DETECTION EQUIP OVE D BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br />OF THE FACILITY'S US TEMS CORDANCE WITH 23 CCR § 2715(b) mrrn> I <br />OPERATOR NAME (print): <br />Martin <br />(Agency Use Only) <br />Local Agency Signature <br />r t nrnvided herein is true and accurate to the best of my knowledge <br />This plan has been reviewed and: <br />Comments/Special Conditions: <br />N Owner M90. <br />00 AugUSt 14, 2006 <br />M92. OWNER/OPERATOR TITLE: <br />Gasoline & Environmental Com{ <br />❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Date: <br />Mgr <br />UN -022A - 2/3 <br />vvww.unidocs.org Rev. 10/14/03 <br />