Laserfiche WebLink
_ ENVIROtENTAL HEALTAEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Donna K. Heran, R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> ` Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> • p • Program Manager Douglas W. Wilson, R.E.H.S. <br /> °��Foaps Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Fax: (209)464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jett Carruesco, R.E.H.S. <br /> March 30,2006 <br /> Sacramento Equipment Maintenance Company, Inc. <br /> Attn: Linda Steiger <br /> 2533 Connie Drive <br /> Sacramento,CA 95815 <br /> RE: 4943 South State Route 99,Stockton,CA 95602 <br /> The San Joaquin County Environmental Health Department(SJCEHD)has received permit to <br /> replace the existing spill buckets on the 87 and 91 tank at the above referenced location. The <br /> permit has been approved with the following conditions: <br /> 1. Contact the local fire department, and the San Joaquin Valley Air Pollution Control <br /> District for applicable permits and requirements. <br /> 2. Any changes in information or scope of work must be submitted to SJCEHD prior to <br /> commencing work. <br /> 3. At least one person who holds the International Code Council"UST <br /> Installer/Retrofitter"certification must be onsite AT ALL TIMES when work is <br /> performed. <br /> 4. A"Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners'agent[pursuant to California Code of <br /> Regulation(CCR)2635(d)]before this upgrade will be considered complete by <br /> SJCEHD. <br /> 5. Contact Muniappa Naidu at(209)468-3439 to arrange the following SJCEHD <br /> inspections; a 48-hour notice is required for these inspections. <br /> a. Corrosion protection:prior to backfilling around the spill buckets,corrosion <br /> protection of the risers must be verified. <br /> b. Overfill prevention:overfill prevention system in compliance with CCR 2635 <br /> (b)(2)must be verified. <br /> c. Spill Bucket: after concrete is poured,verify minimum 5-gallon capacity and <br /> conduct a one hour lake test in compliance with CCR 2635(b)(1). Proper <br /> drainage must also be verified. <br /> d. Third party tank integrity tests must be performed once concrete is poured, <br /> prior to the contractor signing off of the jobsite. The test results must be <br /> submitted to SJCEHD within 7 days of completing this project. <br /> 6. Permit expires 90 days from the approval date. Note: if an extension to the <br /> expiration date is required,this office prior to the expiration date must receive a <br /> written request. <br /> Thank you, <br /> Muniappa Na d , Senior REHS FAM <br /> San Joaquin County <br /> Environmental Health Department <br />