Laserfiche WebLink
�titoring System Certification <br /> Site Address: 4943 S. KINGSLEY(FRONTAGE RD) Date of Testing/Service: 05/12/2005 <br /> HWY 99 @ ARCH AIRPORT RD <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 119.05 <br /> Complete the following checklist: <br /> X Yes El No' Is the audible alarm operational? <br /> ❑x Yes ❑No' Is the visual alarm operational? <br /> x❑ Yes No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> E Yes ❑No' <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> interfere with their proper operation? <br /> x Yes No' N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Q Yes ❑No' ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑x Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑x Yes ❑No <br /> ❑ Yes ❑No' ❑x N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank rapacity does the alarm trigger? i <br /> ❑ Yes' ❑x No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑x Yes' ❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) x❑Product; <br /> 0 Water. If yes,describe causes in Section E,below. <br /> ❑x Yes ❑No' Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> x❑ Yes ❑No• Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> TANKS ARE DOUBLE WALL WITH MECH OVERFILL DEVICE. <br /> Page 2 of 3 Based on CA farm dated 03/01 <br />