My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_1997-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
BILLING_1997-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:42 PM
Creation date
11/5/2018 8:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1997-2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\BILLING 1997-2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA "��•• s <br /> STATE WATER RESOURCES CONTROL BOARD s' o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 6 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SI <br /> ONE REM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED <br /> IDEA OR FACILITY NAME WHERE TANK IS INSTALLED: LAN D - O T C'f3 S. Prrs P--T 9q <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN / 1 <br /> A. OWNER'S TANK 1.0.a B. MANUFACTURED BY: ' `U�IL &5'1T&IPHG: JT <br /> C. DATE INSTALLED(MO/DAY/YEAR) 4- 1-9-7 D. TANK CAPACITY IN GALL IONS: 5' 6fad <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> REGULAR <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ® 14UN LE e 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 1 PRODUCT lbPREMIUM 60 EMPTY �' 4 GASAHOL 7 METHANOL <br /> ❑ UNLEADED ❑ 5 JETFUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT E:] 95 UNKNOWN E] 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.•: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> TR <br /> A. TYPE OF L�f i DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ,� 4 STEEL CUD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD L14 NG ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIORE] 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES ✓ NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) I 1 OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) Lgg7 <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A*P2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A #, 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A*04 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 6 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING —meMONRONING ❑ 99 OTHER <br /> V.TAN LEAK DETECTION ���NNN <br /> 1�YISUAL CHECK �VENTORY RECONCILIATION ❑ 3 VADOZE MONITORING 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED IMO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTSN <br /> (PRIMEb6 SIGNPTURE) �IG� �Nu1Ey I i4�q� <br /> C- a3 L', DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOURN E BELOW <br /> STATE LD.# <br /> COUNTY 9 JURISDICTION M FACIL'nY# TANK N OG) <br /> FT—F I I —F� mccowloill <br /> PERMIT NUMBER — PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. <br /> FORM B (1291) • <br /> FILE THIS FORM WITH THWAL AGENCY IMPLEMENTING THE UNDERGROUND STOR TANK REGULATIONS <br /> ?7 �,Q �IPOROgN/6R{ q� J <br /> l0 pI li"/0-� 1 �"— <br />
The URL can be used to link to this page
Your browser does not support the video tag.