Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> 7ankrK* 9Y <br /> 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER: 2209587 <br /> TEST DATE: 08/12/99 AUSTIN,TEXAS 78757(512)451-6334 <br /> CLIENT: 7-ELEVEN, INC. SITE: 7-ELEVEN #32190, I4ARICET <br /> 3?--�`x'=E..,l,rs �u*) it:l�'TA1`AIfC31NF1:iRMATION <br /> > s. <br /> Tank ID: PDL 3 Tank manifolded: No Bottom to top fill in inches: <br /> Product: PREMIDM Vent manifolded: NO Bottom to grade in inches: <br /> Capacity in gallons: 10,154 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 328 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW STEEL Installed: ATO and CP Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VAPORLESS <br /> Fluid volume in gallons: Model: LD2000 <br /> Tank water level in inches: S/N: 63268 <br /> Test time: NOT Open time in sec: 3.00 <br /> Number of thermisters: TESTED Holding psi: 20 NOT <br /> Specific gravity: Resiliency cc: 350 TESTED <br /> Water table depth in inches: est leak rate mVm: 189.0 <br /> Determined by(method): Metering psi: 10 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ., s�+ .,6 I ,,,, t pSB"f { YTK #3sh'iw3. !" ^"r3 <br /> �" g".ht'"t.-.. #.° <br /> u a <br /> Test time: Material: ENVIROFLEX <br /> Ullage volume: Diameter(in): 2.0 <br /> Length : 120 <br /> Test psi <br /> Ullage pressure: <br /> psi: 50 <br /> Results: <br /> Bleedback cc: 120 <br /> Test time(min): 30 <br /> DATA FOR UTS-4T ONLY: Test 1:Start time: 15:15 <br /> Time of test 1: Finish psi: 50 NOT NOT NOT <br /> Temperature: Vol change cc: 0 TESTED TESTED TESTED <br /> p NOT Test 2:Start time: 15:25 <br /> Flow rate (Cfh): TESTED Finish psi: 50 <br /> Time of test 2: Vol change cc: 0 <br /> Test 3:Start time: 15:35 <br /> Temperature: Finish psi: 37 <br /> Flow rate (cfh): Vol change cc: 13 <br /> Time of test 3: Final gph: 0.007 <br /> Result: PASS <br /> Temperature: <br /> Flow rate (cih): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Draft 08/19/1999 08:34 MSHAW <br />