Laserfiche WebLink
Mitoring System Certification • <br /> Site Address: 4943S. KINGSLEY (FRONTAGE RD <br /> Date of Testing/Service: 05/14/2002 <br /> HWY 99 @ ARCH AIRPORT RD <br /> F. In-Tank Gauging/SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> %YesEol Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Were all tank gauging probes visually inspected fordamage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : <br /> ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> QFor equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Yes ❑No ❑N/q <br /> (Check all that apply)Simulated leak rate: X❑ 3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> X Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑No' Was the testing apparatus properly calibrated? <br /> ❑Yes ❑NoX❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑x Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> QYes ❑No' ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> MYes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Michael Levesque <br /> VR Cert#000-00-5505 <br /> Company Lic If 743160 <br /> page 3 of 3 <br />