My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:20:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\2003 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/21/2003 16:54 1209365154 TANKNOLOGV • PAGE 09/16 <br /> Monitoring System Certification <br /> Site Address: 4943 S. KINGSLEY FRONTAGE RD) Date of Testing/Service: 07/18/2003 <br /> HWY 99 @ ARCH AIRPORT RD <br /> In-Tank Gauging / SIR 9quipment Check this box if tank gauging Is used only for Inventory control. <br /> ❑ Check this box If no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> ccmr late the fellewiae checklist: <br /> a res E]No Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes nw. Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> Yn. F�No Was accuracy of system product level readings tested? <br /> mYee ❑No Was accuracy of system water level readings tested? <br /> M Yes []No Were all probes reinstalled property? <br /> El Yep I ONo Were all ftems on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H.below,describe hew and when these deficiencies were or will be corrected. <br /> Line Leak Detectors (LLD) . <br /> ❑ Check this box If LLDs are not installed. <br /> complete the following cheekliet: <br /> For equipment start-up or annual equipment certification,was a leak simulated to Verify LLD performance? <br /> ❑x yes �No iEl"/A, <br /> (Check all that apply)Simulated leak rate: Q 3 g.p.h©0.1 g.p.h ❑0.2 g.p.h <br /> M res ❑NoWere all LLDs confirmed operational and accurate within regulatory requirements? <br /> M Yes r7Nowas the tesfing apparatus properly calibrated? <br /> ❑Yes [_]Vo For mechanical LLDs,does the LLD restrict product Now if it detects a leak? <br /> Ex Yes LIN. For electronicLLDs,does the turbine automatically shut off If the LLD detects a leak? <br /> Q Yes [3NO E]N/A For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? <br /> x❑Yes DN. ❑N/A For electronic LLDs,does the turbine automatically shut off if any porton of the monitoring system malfunctions or falls a test? <br /> ❑Ne F-1N/A For electronic LLDs,have all accessible wiring oonnWions been visually Inspected? <br /> xD Ys: <br /> a Yce ❑No were all items on the equipment manufaoturers'mainlenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.