Laserfiche WebLink
• <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. k Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. a Plans drawn to scale in non-erasable print. <br /> 3. _,{_ Plot plan to show location of tanks and all associated piping. <br /> 4. _Y, Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. �_ Tank cross-sectional diagram. <br /> 6. �_ Detail of tank,associated piping,excavation and cover. <br /> 7. Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. Verification of product compatibility with the tank(s),piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. At the installation site,prior to installation, a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. Tank Integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK 6 <br /> a a 2 a 3 a a <br /> JUnrlpt <br /> r <br /> �, E xEex�s x ,txFs <br /> x / <br /> w t! <br /> w o w r450/ .0 <br /> CORROSPRO CTIONION ro/p Z/A <br /> t e <br /> CfATITY [J <br /> W `y25 ] C$ Yt'Jr <br /> 13. TANK(s)TO BE INSTALLED <br /> A Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the Installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />