My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:20:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\2003 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For further information concerning fabric specifications and instal- SUMMARY <br /> lation procedures,consult the filter fabric supplier's installation 1. Prepare the tank bed. <br /> guides or instructions. 2. Set and level the tanks. <br /> To install filter fabric,typically filter fabric manufacturers recom- 3. Measure the tank diameter. <br /> mend that the installer line the excavation sides and bottom with 4. Install holddown hardware. <br /> the fabric.Overlap adjoining panels by at least twelve inches. 5. Place and probe the first two lifts of backfill material. <br /> Place backfill material on the panels around the edge of the hole 6. Add backfill to the top of the tank. <br /> to anchor them in place. 7. Measure the tank diameter and repeat the air test. <br /> In wet-hole conditions,use backfill material to sink and hold the After the air test and measurement of tank deflection are success- <br /> fabric in place on the hole bottom. fully completed,it is recommended that the tank be ballasted until <br /> piping installation and final backfilling to grade is completed.When <br /> r r INSTALLATION filling the tank make sure that the tank is adequately vented.The <br /> CAUTION:Xerxes recommends that every site be thoroughly vent must be large enough to allow the displaced air to escape. <br /> evaluated for the potential to trap water or otherwise subject the NOTE:Do not ballast the lank until the backf l is even with the top of the tank <br /> tank to a rise in the local water table.Xerxes recommends that all WARNING:If product is used as ballast,exercise special care in <br /> tanks be anchored in installations in which water may enter the handling.Safeguard against sparks,fire or product spills.Improper <br /> hole.Failure to anchor the tank in a wet hole may damage the tank handling of product can cause a fire or explosion,and death, <br /> or surrounding property. severe personal injury or property damage. <br /> Prepare a smooth,level bed,12"thick,of approved backfill t <br /> material.Place the tank or tanks onto the bed.Do not set Xerxes <br /> tanks directly onto a concrete slab or on timbers,cradles or CAUTION:Never allow an empty tank to remain in a wet hole,or a <br /> directly onto the hole bottom. dry hole that may become wet unless anchoring and backfilling <br /> Leveling:As the tank is being placed,set the tank pitch as shown have been completed.Failure to anchor and backfill may damage <br /> on the site plans.Xerxes does not require that a tank be pitched. the tank or surrounding property. <br /> All pitch is determined by the tank owners specification.If a double NOTE:Deflection readings to be taken in sequence similar to steps described in <br /> wall tank is pitched,the monitor should be at the low end.Use the section 5. <br /> tops of the ribs to establish longitudinal level.Establish lateral level Pump the water from the hole to maintain minimum water level. <br /> by placing the level across the top of a fitting,a manway or a collar. Add a minimum of 12 inches of well-placed backfill material to the <br /> When the tank is placed,take the first diameter reading(Deflection hole,and level the bed to assure uniform bottom support for the <br /> reading'A'on the checklist).See Section 13 for instructions on tank.Position the tank in the hole. <br /> taking deflection readings. Partially ballast tank until it settles firmly on the prepared bed. <br /> If the tank is to be anchored,install the anchoring hardware at this Ballast level in a tank must never exceed water level in hole during <br /> time(See Section 7). installation.Use only enough ballast to sink the tank until backfill <br /> BACKFILLING material is even with the top of the tank. <br /> Use only approved backfill material(See Section 3).Do not mix WARNING:If product is used as ballast,exercise special care in <br /> approved material with sand or native soil.Do not use native soil handling.Safeguard against sparks,fire or product spills.Improper <br /> as ball material.All excavated native soil must be replaced with handling of product can cause a fire or explosion,and death, <br /> approved material.Place one 12"lift of material evenly around the severe personal injury or property damage. <br /> tank.From the hole side or the top of an adjacent tank,work the After leveling tanks,the anchoring procedures in Section 7 must <br /> material by hand completely beneath the tank body and domes to be followed. <br /> provide full support Use a probe long enough to reach beneath the Backfill must be added evenly after anchoring,and remaining <br /> tank and push the backfill in place. Repeat this step with a second dry hole backfilling procedures should be followed as stated in <br /> 12"lift.After the second lift of material has been placed and probed, Section 5. <br /> the backfill can be brought to the top of the tank without further NOTE Cover depth must meet minimum depth specified in Section 7 of these <br /> hand work. installation instructions. I <br /> CAUTION:Do not strike the tank with the tamping bar.The tank NM It is recommended that the tank be completely ballasted once baddill is even <br /> may be damaged and require repair. with the top of the tank <br /> Did <br /> 11 0 oil <br /> RIGHTIIII — WRONG II <br /> I - <br /> III- IIT <br /> IIII_II IIIII <br /> _=IIIII <br /> =IIII =1 II-IIII III I=- II1WIIII _ _ - <br /> When the tank is backfilled to the tank top: <br /> •take an intermediate diameter reading as an in-process check. <br /> •repeatthe 5 PSI airtest as outlined in Section 2,soaping all z" <br /> eicposed areas of the tank and all fittings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.