Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overlill Containment Boxes F <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested r <br /> Test Method Developed By: r Spill Bucket Manufacturer P-1 Industry Standard 17. Professional Engineer <br /> F Other(Specify): <br /> 'rest Method Used By: (- Pressure r Vacuum W Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:LAKE TEST Equipment Resolution:0.0625 in. <br /> Spill Box#Tank T4 Spill Box#Tank T5 Spill Box#Tank T6 <br /> RUL-Fill 1 -Direct- MUL-Fill 1-Direct- PUL-Fill 1 -Direct- Spill Box# <br /> Grade level in Grade level in Grade level in <br /> containment sump containment sump containment sump <br /> Bucket Diameter: 11.00 11.00 11.00 <br /> Bucket Depth: 17.00 17.00 18.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> -starting test <br /> Test Start Time: 15:30:00 15:30:00 15:30:00 <br /> Initial Reading(Rl): 16.50 in. 16.50 in. 17.50 in, <br /> Test End Time: 16:30:00 16:30:00 16:30:00 <br /> Final Reading(RF): 16.50 in. 16.50 in. 17.50 in. <br /> Test Duration: I hr 1 hr 1 hr <br /> Change in Reading(RF-Rl): 0.00 in. 0.00 in. 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +!- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2310970 <br />