My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:25:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2013 TO 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTON <br /> ENGINEERING, INC. <br /> P. 0.Box 1025 9163721888 PH <br /> 3900 Commerce Drive 9163731172 FAX <br /> West Sacramento,CA 95691-1025 CA Contractor's License#617238 <br /> Customer Job Location Work Order# 60125 <br /> Facility Maintenance(7 Eleven) <br /> Attn:Accounts Payable 7-Eleven#2369-32190 Scheduled Date: 6/13/2013 <br /> P.O.Box 1319 4943 S CA-99 Scheduled Time: 8:30:OOAM <br /> Hartford,CT 06143-1319 Stockton,CA 95215 Contact: FM <br /> Customer PO#: 87787106 <br /> Phone: 2099390679 Facility: W31155-023 <br /> Station#: 2369-32190 <br /> Contract# <br /> Work To Be Performed: Call type: Test-Repair-Retest ** <br /> Tanks-Remave <br /> '.drain plugs in all"T"'s under all dispensers. Remove testing tubes,replace all sump gaskets and bolts. <br /> Work Performed: <br /> 6113/13 Arrive on site to replace sump gaskets,remove secondary jumper lines at dispensers and <br /> re-tap/thread sump lids down with new gaskets. <br /> 87,89 and 91 Fill sump: <br /> Upon investigation of facility we found that the gaskets at all 3 fill sumps were in place <br /> on the manway lids.We opened up the inspection ports asscocited with the fill manway <br /> lids and found no gaskets.After checking for sootisediment collected around the pea gravel <br /> on the 87,89 and 91 we located the inspection port gaskets and re-applied them on all 3 ports <br /> after we broke up the pea gravel for water flow in the occuence of liquid entering through the <br /> manway.These lids have self locking bolts and do not need to be re-tapped and threaded. <br /> 87,89 and 91 STP sump: <br /> Upon investigation of all 3 STP sumps,we found that all lids were not fastened properly and installed <br /> correctly.We removed liquid(small amount)and pea gravel found in the STP sumps.We then re- <br /> lubricated the lid gasket and fastened down the lid in its correct position and porperly tighteneing the <br /> latch down as well. These lids are fiber-lite and do not have gaskets or bolts that can be <br /> applied. <br /> Dispensers:112 through 11112: <br /> We removed all secondary jumper lines and/or plugs on all 6 UDCs at the environ coaxial T's and 90's.. <br /> We founf that some product lines had only a plug found in the coaxial fitting and some that had <br /> the jumper line connected to the coaxial fitting that was plugged off.Regardless of what was <br /> discovered,we removed all fittings aumperline/plug)to allow flow at every secondary access port <br /> at all 6 UDCs located on every product line on the UST system.We then reset the sensor <br /> properly and left the jump lines in the cross bar of the UDC/Dispenser so they can be re-attached <br /> for testing purposes as needed. <br /> Safety Meeting:Ryan Powell I Mike Hills Topics of safety and scope of work discussed prior to start of Repair work <br /> at facility.-NO waste water was created during Repairs. <br /> -This Repair is complete with the UST system All Functions Normal and operaing properly <br /> We checked IN/OUT with FM at time of arrival and departure. <br /> Open Problems: <br /> Parts Used: <br /> Qty Part# Mfg Mfg Part# New Serial# Desc Reason <br />
The URL can be used to link to this page
Your browser does not support the video tag.