Laserfiche WebLink
w C <br /> _ STATE OFCALIFORNIA W�� ' <br /> STATE WATER RESOURCES CONTROL BOARD 3 vim, <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B ;a „� oe <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. Rpt N�� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ERMANENTLY CLOSED ON 3 E <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED O <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# / 8. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYHEAR) D. TANK CAPACITY IN GALLONS: <br /> II,TANK CONTENTS IFA-11SMARKED,COMPLETEITEM C. <br /> A, ❑ 1 MOTOR VEHICLE FUEL n 4 OjL B. C. ❑ la REGULAR <br /> 3 DIESEL O 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ^���80/EMPTY ❑ 1 PRODUCT O 1b PREMIUM 4 GASANOL ❑ 7METHANOL <br /> O ❑ ❑ UNLEADED O 9B JET OTHER (DESCRIBEIN ITEM D. BELOW) <br /> 3 CHEMICAL PRODUCT 95 UNKNOWN 2 WASTE 2 LEADED <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF �❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM LJ�2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS O 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING � UNLINED ❑ 95 UNKNOWN <br /> LINING O 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 TING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN O 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A 0 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION AW 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION E-] 1 AUTOMATIC LINE LEAK DETECTOR E] 2 LINE TIGHTNESS TESTING ❑ 3 MDNITORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING X121 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATE DATE ST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF FX 3.WAS TANK FILLED WITH YES a NO <br /> SUBSTANCE REMAINING !'C/ GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> 1PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# F <br /> STATE LD.# <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (7•91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> 7 -0u- ?--)— FOR <br />