Laserfiche WebLink
Facility Name AtamA- N-i6,-tj(A PNC--r0/e//,J6- MSFT, f/vG <br />Address 2Z2 S IVA' V / <br />Date of Inspection// 1-9 % Inspector /,t/ Ile <br />MONITORING ALTERNATIVE #7 <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(:'level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This m itoring alternative shall include: <br />ual precision test on tank and piping. <br />V Tank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />� "ithdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />—L—/Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours.). <br />(For example: level measured and recorded Friday night before <br />—V <br />/ locking and again on Monday morning before opening.) <br />!/_ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />Ttedeo <br />by the dates specified. X�// <br />I. Precision test(z) must be performed by -9Xtnd results submitted to this <br />D2. <br />office within 30 days of the Lost. <br />Tank gauging must be started inroediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />.•, <br />SOAAO Of TRUSTEES <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />Jun•• Culoan•on, Pima. <br />SERVING <br />Pelftcla E. Vannueel. Secy. <br />City of Lodi <br />Anlhonalte Van Sprons•n <br />1601 Eaal Hazelton Avenue, P. O. Box 2009 <br />San Joaquin County <br />Eaff <br />aM•t <br />Stockton. California 95201 <br />City <br />Fein Bu <br />City off Manteca <br />0•nl•1 L. Florae <br />209/466-6781 <br />City of Ripon <br />John D. Mast, M.D. <br />City of Stockton <br />William J. Wada <br />Jogi Khanna, M.O.. M.P.H.. Oistdcl Health 011lce,City <br />Of Tracy <br />San Joaquin County <br />Mary Anna Lova <br />San Joaquin County <br />Facility Name AtamA- N-i6,-tj(A PNC--r0/e//,J6- MSFT, f/vG <br />Address 2Z2 S IVA' V / <br />Date of Inspection// 1-9 % Inspector /,t/ Ile <br />MONITORING ALTERNATIVE #7 <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(:'level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This m itoring alternative shall include: <br />ual precision test on tank and piping. <br />V Tank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />� "ithdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />—L—/Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours.). <br />(For example: level measured and recorded Friday night before <br />—V <br />/ locking and again on Monday morning before opening.) <br />!/_ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />Ttedeo <br />by the dates specified. X�// <br />I. Precision test(z) must be performed by -9Xtnd results submitted to this <br />D2. <br />office within 30 days of the Lost. <br />Tank gauging must be started inroediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />