Laserfiche WebLink
14. l�f . Oil 'v 0 1111j-E <br /> Name of Supplier,Owner or Dealer Address No.and Sut(s) City State Data of Test <br /> i <br /> 15. TANK TO TEST 16. CAPACITY From <br /> Station Chart <br /> Z By most accurate <br /> R �' // Nominal Capacity ,S�XD`� capacity chart available Tank Manufacturer's Chart <br /> T I � <br /> M O Identity by position Gallons aliens a Company Engineering Data <br /> W <br /> 70 f <br /> Is there doubt as to True CapacityT5?1 CS Charts supplied with petro The <br /> '�, WUK 1ES1ER <br /> Brand and Grade See Section"DETERMINING TANK CAPACITY" L Other <br /> 17. FILL-UP FOR TEST Stick Readings TotalGallons <br /> to Ye in. Gallons ea.Reading <br /> Stick Water Bottom 9S 11 _ <br /> before Fill-up r inventory <br /> to 3k in. Ga ons <br /> Fill Up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter Product in full tank(Up to fill pipe) <br /> ± OQo /J <br /> '-c Ca 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK `''`(= • /' •DO0O$�� VAPOR RECOVERY SYSTEM <br /> 'I Q 0 See manual sections applicable.Check below and record procedure in lag(26). �;�J p a ti r I�(�A�C p roil �t'y rr N e .) ❑ Stage I <br /> '©ran <br /> i�;�''r` ata u <br /> Z ❑ Water In tank ❑ High water table in tank excavation ❑ Line(s)being tested with LVLLT ❑ ! <br /> am <br /> a 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> Ila <br /> 0 19. TANK MEASUREMENTS FOR <br /> rev TSTT ASSEMBLY Is Today Warmer?l Colder?{]_°F Product in Tank F Fill-up Product on Truck °F Expected Change( + or - ) <br /> 0 Bottom of tank to Grade*.................... �L—" 22. Thermal-Sensor reading after circulation Z °F <br /> Q? Add 30"for 4"L ........ " fddiigits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per IF In range of expected change�eR - <br /> _// digits <br /> Total tubing to assemble Approximate ........ Z�Yo <br /> 24. �/�`�' _ X��ff+'&z- _ ���� f - gallons <br /> 20. EXTENSION HOSE SETTING <br /> //� rr total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade*.................................. full tank(16 or 17) involved product per IF <br /> Extend hose on suction tube G"or more ' <br /> below tank top suctio........................ ...... —_rr 25. `7 Z 3 yy1y S— -+_ � = — . 0 0/� 3� - This is <br /> volume change per°F(24) Digits per IF in teat Volume change per digit. test <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 3©. HYDROSTATIC 31. 34. 38.NET VOLUME 39• <br /> 26. VOLUME MEASUREMERTS{V1 TEMPERATURE COYPEMSAi{OM ACCUMULATED <br /> LOG OF TEST PROCEDURES PRESSURE RECORD to.N1 DAL. USE FACTOR(a) EACH READING CHANGES CHANGE <br /> CONTROL <br /> 27. 2$. 29. Standpipe Level 32. Product in product 35. 36. 37• Adjuflmeot 111 At Ili¢lira recerd <br /> in Inches Change Competition lata End ReRMwe <br /> DATE Record details of setting up ReadinE Graduate Replaced l-) Thermal Higher+ (c) a (a)= Volume Minus <br /> and running teat.{Use full Beginning Level to Sensor Lower- Expansion+ Expansion(+)ar At Lw lna teapots <br /> length of line if Headed.) of which Brfere After PraduU Reading (c) Contraction- Contraction(-) CMaa{e per tiwr <br /> TIME Reading Restored Reading Reading Recovered(+) s33(Y}—�k37(T) {MFPAcriledal <br /> l21 hr.I <br /> f ` ^7 G� —� <br />