Laserfiche WebLink
STATE OF CALIKMA ` <br /> STATE WATER RESOURCES CONTROL BOARD s <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORA B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ b CHANGE OF INFORMATON ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I I I v ��Q i r- <br /> 1. <br /> 1 OUT w G t ~5rt <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IPUNKNOWN `1 <br /> A. OWNERS TANK I.D.s O B. MANUFACTURED BY: L <br /> C. DATE INSTALLED IMO DAYrYEARy D. TANK CAPACITY IN GALLONS: <br /> 11.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> REGUI-AR Z-3. <br /> A I MOTOR VEHICLE FUEL ❑ 4 O, B. C. ❑ UNLEADED 3 DIESEL ❑ 6 AVIATIONGAS <br /> GASAHOL <br /> 2 PETROLEUM ❑ 80 EMPTY IK 1 PRODUCT ❑ 1bPR UNLEADED ❑ 5 JET FUEL 7 METHANOL <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER ('DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.,)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED y C.A.S.s: <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALL THAT APPLIES IN BOX0 AND E <br /> A TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAVLTEDTANK) ❑ 99 OTHER <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W!FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL CpMPATtBLE W1FRP <br /> (PrimaryTAnkl ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NOT <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VRNYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT IN (YEAR) Ar OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> N.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE )3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND bon BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WY COATING A U B 100% METHANOL COMPATIBLE WJFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 9999 (OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3 MONfTORING <br /> 99 OTHER <br /> V.TANK LEAs(DETECTION � <br /> C 1 VISUAL CHECK i I 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> 6 TANK TESTING 1`❑� 7 INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> ESTIMATED DATE LAST USED(MO;DAY YR) 2 FSTIVATED QUANTITY OF 3.WAS TANK FILLED WITH YES El NO <br /> SUBSTANCE REMAfNING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,A45 TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME ` DATE <br /> (PRINTED A SIGNATURE( <br /> W <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE LD.# <br /> PERMIT NUMBER PERMIT APPROVED BYlOATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STO TANK REGULATIONS FORMS {,2.9,) V ` FOROOSt&R6 <br /> J <br />