Laserfiche WebLink
APR-18-95 TUE 4: 20 PM ARONSON ENGINEERING FAX N0, 916 381 1622 <br /> �n1 <br /> San Joaquin Valley <br /> Unified Air Pollution Control Distric� <br /> AUTHORITY TO CONSTRUCT <br /> PERMIT NO: N-6oa1-i ISSUANCE DATE: 1243,V4 <br /> 43AL OWNER OR OPERATOR: PACIFIC SEII./ UE R47 <br /> MAILING ADDRESS: 2646 WATT AVENUE, SUITE 4 <br /> SACRA dZNTO, CA 95251 <br /> DATION: 4051 NBWTON RD, STOCKI oN <br /> TO GDF,M IFIC"T TO GDF; &TION:fiXIS`r1ATp 10,000 GALLON Use&I7ISPPNSER AND BVSTAFI,ONls(I) 10,000 <br /> G ON UNDVIZGROUND GASOLINE STORAGE TANK SERVED BY AN BMCO WHEATON PHASE I VRS (G-70-97A)&TWO <br /> ,Z) N077T tC SERVED IIY EMCO WHEATON PHASE 11 VRS(G-70-52AM), <br /> CONDITIONS <br /> I.F1 nozzles sh211 be equipped with cot xial hose configurations. <br /> 2. At least 95% byy weight Of all gasoline vapors displaced during the filling of storage tanks and the <br /> rasing Of vehicles Shall be prevented from entering the atmosphere. <br /> 3. a vapor recovery system and its components shall be iastallcd, operated, and maintained in a=rduce <br /> with the State certiflaWon requirements. <br /> A. permittee shall perform a Dynamic B= Pressure'rest using Bay Area Air Quality NLimgment District <br /> Method ST-27 or CARB Method TP-201.4 within 60 days after initial start-up and ar least once every five <br /> s thereafter. <br /> i. tree shall t�erform a Leak Test using Bay Area Air Quality Marugoment District Method ST-30 or <br /> CA I�B Method Tp.201.3 within 60 days after initial start-up and at least once every five years <br /> tole'*Di�strilct <br /> shall be notified by the permittee 15 days prior to each teat. The test results shall be <br /> bmitted to the District no laser than 30 days after ca= test. <br /> Tata is NOT a PERMrr TO OPERATE. Approval or denial of a PERMIT TO OPERATE will be made after m iaapetYioa <br /> Jro fy that Ma equipment has beta ceaafsaowl is secordance with the approved plass, spooirmda=sad conditions of this <br /> At <br /> )try to C°a�tract, and to dote =IWC if the Equipment net be operwad is compliance with ail Put=and R yvlWicas of the <br /> +O2quin Valley Unified Air Pollution Control Diatriet. YOU MUST NOTIFY THE DISTRICT COMPLIANCE DIVISION <br /> AT(209) 545-7000 WEEN CONSTRUCTION OF THE EQUIPMENT IS COMPLETED. Unless oonstnmtion bas cotnmtaced <br /> 74mi to Ruiz 2050, arts Authority to Construct sbait apire and application shall be esamlled two yean from the date of <br /> The applicaar is responsible for complyingwith all Isar, ordinances and retulwions of all othar guvcm— tat ag wiw <br /> which may pemia to the above equipment, <br /> ISM L. CROW, EXECUTIVE DIRECTORJAPCO <br /> s . DIRECTbu nF PIT SERVICES <br /> ° Rotical Office 03230 Kiernan Me., Suite 130 *Modesto, t:alrfornis 95356 *(209) 545-7000* FAX (209)545-9&52 <br /> 94- -8 <br />