My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
10901
>
2300 - Underground Storage Tank Program
>
PR0503950
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:46 PM
Creation date
11/5/2018 10:07:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0503950
PE
2381
FACILITY_ID
FA0006029
FACILITY_NAME
PG&E MANTECA SERVICE CENTER
STREET_NUMBER
10901
Direction
E
STREET_NAME
STATE ROUTE 120
City
MANTECA
Zip
95336
APN
208-200-23
CURRENT_STATUS
02
SITE_LOCATION
10901 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\10901\PR0503950\REMOVAL 1989.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> UNDERGROUND STORAGE TANK CLOSURE PLAN <br /> r <br /> FOR t <br /> PACIFIC GAS AND ELECTRIC COMPANY' S r_ <br /> MANTECA SERVICE CENTER �-P, tj <br /> 1 . Location : Manteca Service Center, 10901 East Highway 120 , <br /> Manteca , California. <br /> Contact : Mike Harbick Phone * (209) 443-5563 <br /> 2 . Physical Description : 1 , 000 gallon, single walled steel tank <br /> with associated piping. <br /> 3 . Contents : Unleaded Gasoline <br /> 4 . Contractor: Precision Industries <br /> 5 . Soil Sampling: The soil sampling and testing will be per- <br /> formed by the Twining Laboratories , Inc . <br /> 6. Notification : The San Joaquin County Health Department will <br /> be notified at least 48 hours prior to tank removal and soil <br /> sampling . <br /> 7 . Procedures : Before excavation begins , any residual sludge or <br /> free liquid will be removed from the tank . Clean excavated <br /> material will be stockpiled on-site for use in backfilling <br /> the excavation . The tank and piping will then be uncovered <br /> with a backhoe. The piping will be removed and stockpiled <br /> for off-site disposal . <br /> Flammable vapors will be purged by introducing 1 . 5 pounds of <br /> dry ice into the tank per 100 gallons of tank capacity and <br /> sealing all openings except the vent port , at least one hour <br /> before tank removal . Following removal , the tank will be <br /> manifested on-site and transported by a licensed hazardous <br /> waste hauler to the Erickson Inc. class l disposal facility <br /> in Richmond Ca. <br /> Any obviously contaminated soils will be excavated and <br /> stockpiled for off-site disposal . A soil sample will then be <br /> taken from the bottom of the excavation and laboratory tested <br /> for Total Hydrocarbons . At least one sample will be taken <br /> for every 200 square feet of tank excavation and for every 20 <br /> lineal feet of piping excavation . <br />
The URL can be used to link to this page
Your browser does not support the video tag.