Laserfiche WebLink
PART 4: ENVIRONMENTAL HEALTH FEES Page 12 <br /> UNDERGROUND STORAGE TANK PROGRAM FEES <br /> (REVISED JANUARY 1,1991 R-90-1452; NOVEMBER 1,1992 B-92-1591;AUGUST 1,2000 R-00-329; AUGUST 1,2001 R-01- <br /> 420);AUGUST 1,2003 R-03-392) <br /> BASE <br /> PER PER <br /> $ ANNUM EACH HOUR <br /> USTFacility and 1 Tank............................................................................................................... 500 x x <br /> EachAdditional Tank. ......................................................................................................... 125 x x <br /> StateSurcharge UST Fee.............................................................................................................State Feet x x <br /> Plan Reviewllnspections <br /> New Tank Installation(per Project)..................................................................................... 933(8 hr minimum) x <br /> Permanent Closure (per Tank)........................................................................................... 933(3hrminlmum) x <br /> Temporary Closure (per Facility)....................................................................................... 93 3(3 hr minimum) x <br /> Tank Repair(Lining)(per Tank)........................................................................................... 93 3(3 hr minimum) x <br /> Tank Retrofit (per Facility).................................................................................................. 93 3(3 hr minimum) x <br /> Piping Repair(per Facility).................................................................................................. 93 3(3 hr minimum) x <br /> Unauthorized Release Evaluation............................................................................................... 93 3(1 hr minimum) x <br /> Reinspection................................................................................................................................. 933(1 hr minimum) x <br /> Unified Program Facility State Surcharge Fee..........................................................................State Fee x <br /> 1 Existing underground storage tank(s)(UST),as defined in CCR Title 23,not permitted and registered are subject to all the requirements of State and <br /> Federal law as well as annual permit fees for the five years prior to the date of discovery,applicable penalties and state surcharge fees. <br /> 2Unified Hazardous Waste and Hazardous Materials Management Regulatory Program (Unified Program) Underground Storage Tank State <br /> Surcharge Fee is established by the State of California Secretary for Environmental Protection (Secretary) on an annual basis and assessed as <br /> described in the HSC. <br /> 3Hourly rate is calculated at one and one half times for after regular office hours,on weekends and on holidays.A minimum of three(3)hours at this <br /> rate will be charged for Call Back inspection/response services. <br /> 4 Unified Program Facility State Surcharge Fee is established on an annual basis by the Secretary and is applied on a per facility basis. Facilities with <br /> more than one Unified Program component will be charged one Unified Program Facility Surcharge Fee per year. <br /> SJC ENVIRONMENTAL HEALTH DEPARTMENT FEE SCHEDULE AUGUST 1,2003 <br />