My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
2300 - Underground Storage Tank Program
>
PR0231600
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 10:36:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231600
PE
2361
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\N\HWY 99\14800\PR0231600\COMPLIANCE INFO 2009-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by-EHD) <br /> 1_ Site map enclosed? YES[I NC3�(] s - <br /> 2. Submit copies of]CC Service Technician and/&Installer's certificate and all manufacturer traiining certificates for each <br /> person installing or testing.any component that is repaired or replaced. Ensure a cgpy of the "Site Health and Safety <br /> Plan"is.available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced.and.attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a.component, descrtie flow this will be done. (if. <br /> Adqj6g piping, UDC's, or other UST equipment,.or performing tank top upgrade, use.the UST Installation Application <br /> pages 4-'8 as necessary fora timely plan review): <br /> TCS fl � 0-1 ic.22ri. <br /> 1 <br /> lek 0, k)Citi t6j.(A 6CA i W.ALAJ L fn kf o <br /> 69ISALP Ev6 Rdad . oc'60W -- <br /> 4. _List of equipment to be used(Attach-manufacturer's specification.sheets showing third-party approval); <br />
The URL can be used to link to this page
Your browser does not support the video tag.