My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
4051
>
2300 - Underground Storage Tank Program
>
PR0231868
>
COMPLIANCE INFO 1987-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:52:41 PM
Creation date
11/5/2018 10:43:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2011
RECORD_ID
PR0231868
PE
2361
FACILITY_ID
FA0004045
FACILITY_NAME
AT&T California - UER47
STREET_NUMBER
4051
STREET_NAME
NEWTON
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
4051 Newton Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\N\NEWTON\4051\PR0231868\COMPLIANCE INFO 1987-2011 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Please complete one report forVuhrank) <br /> Tank owner: PAGE c $e � f <br /> Facility Address: <br /> ['hone #:--- 3 2I _ ri C owners' Tank ID # 2- 2 9 <br /> Tank Capacity 1�, Contents <br /> Options to meet the 1998 Deadline <br /> Chaose A, B,or C,then enter the target or actual completion dates as Completion Dates <br /> p ( ) �ppropriate- <br /> Tar et Actual <br /> A) Permanent closure ar removal of the tank and piping system <br /> B)Replacement of the tank and piping with a double-walled tank,double walleddtri and <br /> dispenser containment. (Required for non-motor vehicle fuel tanks p p Bt <br /> } <br /> C)Tank and piping upgrade as Follows: <br /> 1) Installation of striker plate(s)in tank. <br /> 2) Installation of 1S gallon spill container at the fill tube. -- — <br /> 3) Installation of an overfill prevention device with one of the following: <br /> a) Automatic shutotTdevice. <br /> b)Bahl float valve. <br /> c)Audible and visual overfill alarm. — <br /> 4)Corrosion protection for the tank provided by one of the following- <br /> a)Tank made of non-corrodible material(such as fiberglass). <br /> b) Steel tank clad with(or encased)in non-corrodible material <br /> c)Steel tank upgraded with interior lining and exterior cathodic _ <br /> protection. <br /> d)Steel tank upgraded with interior lining, exterior cathodic protection, <br /> and a bladder system. <br /> 5)Corrosion protection for the associated piping provided by one of the following? <br /> a) Piping made of non-corrodible material(such as fiberglass ) _ <br /> b) Installation of new fiberglass or other non-corrodible. double walled <br /> piping and dispenser containment. <br /> c)Steel piping with corrosion-resistant coating and cathodic protection. <br /> d) Steel piping upgraded with cathodic protection. <br /> b) Installation of a line leak detector with an automatic shutoff systcm/device. <br /> Tanw t Signature: d 6'' <br /> Dart signed: <br /> (choose one) <br /> ai191I.pgraNu+"Rr Upt du lune 7,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.