Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORZ <br /> TANKS , 1 ra-(1 D <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 �� <br /> YI.PDfYNG<CONSTRUCTION <br /> Id hat l Pae of <br /> UNDERGROUND PIPWG <br /> SYSTEM TYPE ❑1.PRESSIBtBPQ Z.SUCTION ABOVEGROUND PIPING <br /> CONSTRUCTION/ L SINGLE WALL ❑3.GRAVITY 45i. ❑I.PRESSURE ❑2.SUCTION ❑3.GRAVITY ass. <br /> MANUFACTURER ❑3.LINED TRENCH ❑99.OTHER 460. p'1,SINGLE WALL <br /> O 2.DOUBLE WALL 5.UNKNOWN ❑95.UNKNOWN 462. <br /> MANUFACTURER ❑2.DOUBLE WALL ❑99.OTHER <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100°/.METHANOL 461. MANUFACTURER <br /> ❑L BARE STEEL 465' <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL [36.FRP COMPATIBLE W/100%METHANOL <br /> El3.PLASTIC COMPATIBLE WITH CONTENTS ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑4.FIBERGLASS <br /> Q5,UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS <br /> ❑8.FLEXIBLE(HDPE) ❑99.OTHER ❑8.FLEXIBLE(HDPE) 1199.OTHER <br /> El 3.STEEL W/COATING ❑9.CATHODIC PROTECTION d 4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> W <br /> ❑5.STEEL W/COATING UNKNOWN <br /> YII. <br /> PIPING LEAK DETECTION Check Jikat I A:aescritwn enheivanfiodn m mslWl;tiEsubmil'edio tbq b'pl ene 46s. <br /> UNDERGROUND PIPING <br /> SINGLE WALL PIPING ABOVEGROUND PIPING <br /> PRESSURIZED PIPING(Check all that apply): 466, SINGLE WALL PIPING <br /> PP y)' PRESSURIZED PIPING(Check all that apply): <br /> 467. <br /> 0 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION 0 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> +AUDIBLE AND VISUAL ALARMS, SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> ❑2. MONTHLY 0.2 GPH TEST +AUDIBLE AND VISUAL ALARMS, <br /> [32. MONTHLY 0.2 GPH TEST <br /> 3. ANNUAL INTEGRITY TEST(0.1 GPH) / <br /> K� �J ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> CONVENTIONAL SUCTION SYSTEMS /7 04. DAILY VISUAL CHECK N ,G <br /> TRIENNIAL PI <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+ CONVENTIONAL SUCTION SYSTEMS(Check all that apply) // <br /> INTEGRITY TEST(0.1 GPH) PING 115. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0,1 GPH) <br /> E17. SELF MONITORING <br /> GRAVITY FLOW SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> 117, SELF MONITORING <br /> E19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> j GRAVITY FLOW(Check all that apply): <br /> N ❑8. DAILY VISUAL MONITORING <br /> SECONDARILY CONTAINED PIPING 09. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> PRESSURIZED PIPING(Check all that apply): SECONDARILY CONTAINED PIPING <br /> Pp y)' PRESSURIZED PIPING(Check all that apply): <br /> 10, CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check anej <br /> ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ALARMS AND(Check one) <br /> STEM a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> Dc. NO AUTO PUMPSHUT OFF DISCONNECTION <br /> 011. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOWSHUT 0e' NO AUTO PUMP SHUTOFF <br /> OFF OR RESTRICTION ❑11.AUTOMATIC LEAK DETECTOR <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM 12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM <br /> [113- CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) ❑ E CONTINUOUS SUMP SENSOR+gUDIBLE AND VISUAL ALARMS <br /> ❑14. CONTINUOUS SUMP SENSOR O y) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> AUDIBLE AND VISUAL ALARMS �A�OPUMPSHUTOFF [3 14. CONTINUOUS SUMP SENSOR WI PPP <br /> ❑ I5. AUTOMATIC UNE LEAK DETECTOR 3.0 GPH TES W AUDIBLE AND VISUAL ALARMS <br /> ��AUTO PUMP SHUT OFF <br /> SHAT OFF OR RESTRICTION ( T) --�- FLOW <br /> [115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPN TEST) <br /> ❑l6. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DALLY VISUAL CHECK ❑16. ANNUAL INTEGRITY TEST(0,1 GPH) <br /> ❑V. DAILY VISUAL CHECK <br /> VIIi.DIS$ENSER COIITAIN ' rg <br /> DISPENSER CONT:=;//101 <br /> FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE <br /> DATE INSTALLEDCONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS 4. DAILY VISUAL CHECK dbs. <br /> � CONTINUOUS DISPENSER PAN SENSOR W �5 TRENCH/LINER MONITORING <br /> _�j AUTO SHUT OFF FOR �5�2 <br /> DISPENSER AND VISUAL CABINS Y\ NONE <br /> IX.OWNERJOPERATOR SICNATUlEi1 <br /> TU O E MR . <br /> cert' that the in short Prov' -herein is a and accurate to the best of my knowledge. <br /> DATE: i-1 �l �� <br /> 11G <br /> NAMEOFO OF OR(p' [): <br /> TITLE OF OWNER/OPERATOR:� 4Tx. <br /> Pemtit N=I r( gency use anly) - 475. Permit A <br /> p ved By(Agency use only) nd. Permit Expiration Date(Ageoey m<oNY) ns. <br /> J <br /> UPCF hwlwrc-b(1N9)-3/4 htip://www,unidocsorg <br /> Rev.021/6/00 <br />