GENERAL b04C��
<br />1. SHOULD A CONFLICT - OCCUR BETWEEN THE SPECIFICATIONS.
<br />DRAWINGS CODES. STANARDS OR MANUFACTURERS INSTRUCTIONS.
<br />THE MORE STRINGENT OR RESTRICTIVE CONDITION SHALL HAVE
<br />PRECEDENCE.
<br />2. THE DRAWINGS AND 5PECIFICATION5 REPRESENT THE FINISHED
<br />PROJECT. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
<br />THE CONTRACTOR SHALL Be RESPONSIBLE FOR CONSTRUCTION
<br />MEANS. SEQUENCES AND PROCEEDURES IN ACCORDANCE WITH GENERALLY
<br />ACCEPTED CONSTRUCTION PRACTICES.
<br />3. DIMENSIONS AND SITE CGNDITIONS SHALL BE VERIFIED BY THE
<br />CONTRACTOR BEFORE START OF CONSTRUCTION OR FABROR`CATION.
<br />IF SHALL
<br />NOTIFY THE MELENOEZENCIES EDESIOHOH GROUP INH WRITING PRIOR TO
<br />COMMENCNENT OF CONSTRUCTION.
<br />4. CONTRACTOR SHALL PERSERVE IN PRC -EXCAVATION CONDITION
<br />ACTIVE UTILITIES TRAVERSING THE PROJECT SITE. CONTRACTOR
<br />SHALL REPAIR DAMAGE TO SUCH UTILITIES CAUSED BY WORK
<br />TINDER THIS CONTRACT TO THE SATISFACTION OF THE MELENDEZ
<br />DESIGN GROUP THE LOCATION AND SIZES OF EXISTING UNDERGROUND
<br />UTILITIES ARE SHOWN IN AN APPROXIMATE WAY FROM INFORMATION
<br />OF RECORD AND SITE INVESTIGATION THE CONTRACTOR SHALL
<br />DETERMINE THE EXACT LOCATION AND SIZES OF ALL EXISTING
<br />UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES
<br />,TO Be FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH
<br />MIGHT Be OCCA55IONED BY THE CONTRACTOR'S FAILURE TO
<br />EXACTLY LOCATE AND PRESERVE ANY AND ALL OF THE INDICATED
<br />UNDERGROUND UTILITIES WHICH ARE SHOWN.
<br />B. UNDERGROUND STORAGE TANK DIMENSIONS SHOWN ON DRAWINGS ARE
<br />BASED ON TKE BEST AVAILABLE INFORMATION. ACTUAL STORAGE
<br />TANK DIMENSIONS KAY VARY, VERIFY WITH MANUFACTURER.
<br />6. CONTRCATOR SHALL PROTECT EXISTING STRUCTURES. TREES AND
<br />OTHER PERMANENT OBJECTS. SHOULD ANY FINISHED WORM BE
<br />DISTURBED DURING UST . INSTALLATION THE
<br />CONTRACTOR SHALL RE57ORE TO ITS ORIGINAL CONDITIONS.
<br />DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALE.
<br />SCOPE OF WO E
<br />1.
<br />INSTALL
<br />ONE (I) NEW DOUBLE WALL 20,000 GALLON FUEL
<br />TITLE SHEET
<br />STORAGE
<br />TANKS SPLIT (1) UNLEADED AND (1) 8K
<br />F-2
<br />PREMIUM
<br />INCLUDING ALL RELATED PIPING, EQUIPEAENT '
<br />CIRCUITS.
<br />TANK SECTION
<br />ACCESSORIES.
<br />LEAK MONITOR AND CONTROLS. POWER
<br />F-5
<br />COORDINATE WITH EQUIPEMENT SUPPLIER FOR REGISTER INSTALLATION.
<br />2.
<br />INSTALL
<br />NEW 8' REINFORCED CONCRETE SLAB TO EXTEND A
<br />CONTRACTOR:
<br />MINIMUM
<br />OF 2'-0' BEYOND PERIMETER OF TANK.
<br />Sz-oclE-roN { ZA - CC S-2-0 s
<br />jet)Lkt-Lk -93T3
<br />' C>P.aSSER '
<br />3.
<br />INSTALL
<br />(2) TWO W.AAYNO MULTI PRODUCT DISPENSERS
<br />REVISIONS
<br />PROVIDE
<br />ALL NECASSARY EQUIPEMENT RELATED TO DISPENSERS
<br />By
<br />FOR A COMPLETE INSTALLATION.ALSO PROVIDE ALL UO EQUIP.
<br />1
<br />FOR FUTURE DISPENSER
<br />4.
<br />INSTALL
<br />NEW RAISED CONCRETE ISLANDS. VALETS AND STEEL BOLLARDS
<br />AND ALL
<br />EQUIPEMENT REWIRED FOR A FINISH PRODUCT.
<br />(.
<br />INSTALL
<br />NEW Veez>eIL RSYAf 3co F'Z -rvW TOIJK H'rDNITc.Tt-
<br />TH15 PROJECT SHALL COMPLY W17H
<br />1994 UBC, UPC NFC AND 1993 NEC
<br />THIS SCOPE OF WORK 15 FOR REFERENCE ONLY
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE
<br />REVIEW AND UNDERSTANDING OF ALL DRAWINGS
<br />PRIOR TO COMMENCEMENT OF WORK.
<br />w6CONOTIff HAP
<br />PROJECT LOCATION
<br />ALL TANK AND LINE INSTALLATIONS SHALL BE
<br />PERFORMED BY A LICENSED C61 -D40 CONTRACTOR
<br />THESE PLANS ARE DIAGRAMATIC IN NATURE AND
<br />ARE NOT INTENDED TO BE AN REPRESENTATION
<br />OF THE FINAL PRODUCT. THESE PLANS SHALL BE
<br />USED BY THE CONTRACTOR AS AN AID ONLY.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br />COMPLETE INSTALLATION OF TANKS, PIPES,
<br />AND ALL EQUIPMENT ASSOCIATED WITH SCOPE
<br />OF WORK.
<br />rT
<br />p -jt<
<br />I
<br />TITLE SHEET
<br />F-1
<br />SITE PLAN
<br />F-2
<br />PIPING SCHEMATIC
<br />F-3
<br />TANK SECTION
<br />F-4
<br />FUEL DETAILS
<br />F-5
<br />FOUNDTAION PLAN
<br />F-6
<br />ELECTRICAL PLAN
<br />F-7
<br />CONTRACTOR:
<br />UST TANK NOTES
<br />I. ALL UNUSED TANK OPENINGS SHALL BE TIGHTLY SECURED WITH
<br />PIPE PLUGS AND SHALL BE COVERED WITH FIBERGLASS CAP MATT
<br />INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS
<br />UTILIZING WET RESIN,
<br />2. ALL VERTICAL R15ER THREADS SHALL BE WRAPPED IN FIBERGLASS
<br />3' MIN ABOVE EXPOSED THREADS IN ACCORDANCE WITH MANUFACTURERS
<br />SPECIFICATIONS.
<br />3. TANKS SHALL BE TESTED AND INSTALLED IN ACCORDANCE WITH
<br />MANUFACTURES RECOMMENDATIONS AS WELL AS LOCAL ORDINANCES.
<br />4. ALL CONTAINMENT BOX ASSEMBLIES SHALL BE FIBERGLA55ED TO
<br />TANK RING AND CAPABLE OF WITHSTANDING HYDROSTATIC TEST.
<br />S. DIEELECTRIC UNIONS TO BE USED ON ALL UNDERGROUND CONDUITS.
<br />6. ALL CONDUITS TO HAVE SEAL -OFFS PER LATEST EDITION OF THE
<br />NATIONAL ELECTRIC CODE. ALL 'J' BOXES TO BE EXPLOSION PROOF
<br />7. ALL CONDUITS AND PIPING PENETRATIONS OF THE SUMP BOXES
<br />TO BE SEALED BY THE APPROPRIATE SIZE ENTRY BOOTS,
<br />8. USE CABLE CONNECTOR FITTINGS AT MONITOR A LEVEL GAUGE
<br />CONNECTIONS TO J -BOXES AND PIPE FITTINGS IN SUMP BOXES.
<br />9. CONDUITS TO BE 3/4' PVC COATED RIGID STEEL UNLESS OTHER-
<br />WISE SPECIFIED.
<br />10. ALL PRIMARY STEEL PIPING AND FITTINGS INSIDE SUMP BOXES
<br />TO BE BLACK IRON 5CH 40 PAPE WITH 1500 MALLEABLE IRON
<br />FITTINGS.
<br />11. ALL PRODUCT PIPING TO BE 2' A'Oke6M(TI)
<br />FIBERGLASS PIPE.
<br />12. VENT AND VAPOR RECOVERY PIPING TO BE 2' FIBERGLASS
<br />PIPE.
<br />13. ALL CONCRETE TO BE 2500 P51 AT 28 DAYS.
<br />14. ALL PIPING TO SLOPE DOWN TO TANKS 1/4' PER FOOT MIN.
<br />I5. TANK HOLE A PIPING TRENCHES TO BE LINED WITH FILTER 6
<br />FABRIC LINER TYPAR OR EQUAL. ALT. LETTER
<br />FROM P.E. IF APPLICABLE.
<br />16. WRAP ALL STEEL PIPING (UNDERGROUND OR IN CONTAINMENT SUMPS)
<br />WITH TWO LAYERS OF 20 MIL PIPE WRAP TAPE. SPIRAL MOUND IN
<br />OPP051TE DIRECTIONS WITH 50% OVERLAP.
<br />17. ALL MANHOLES MUST BE LIQUID TIGHT, SECURABLE 8 RATED FOR
<br />H-20 TRAFFIC LPAD.
<br />16. INSTALL METAL PRODUCT IDENTIFICATION d QUANTITY TAGS IN
<br />FILL BOXES. ATTACHED TO RISERS.
<br />19. ALL EQUIPMENT. HARDWARE AND SYSTEM COMPONENTS MUST BE
<br />INSTALLED CONFORMANCE WITH MANUFACTURE'S INSTRUCTIONS
<br />AND SPECIFICATIONS
<br />OV-
<br />5ANJUAS 8r!CUu;dTY
<br />l/ ENVIRONMENTAL HEALTH DIVISION
<br />oor
<br />P.O. Box 3804 E.8 Stockton, CA 99,5eber Ave, Third201-0388
<br />Phone: (209)468-3420
<br />0 Approved
<br />E'�APProved with changes: See Remarks
<br />0 Disapproved: See Remarks
<br />Remarks
<br />D y
<br />Q "";C" ial of Shown
<br />Plans d extends only 10 that
<br />wh;ctl is ,ITOv<m and Clpscribpd hereon but
<br />do, =s not authorizeor eZS nraV`e any O,n stnn
<br />or d:�•,d l�.;.;,n Ot rcgUirorne;nts of :itaip iapYS Or
<br />A
<br />i nN
<br />CAF, WA5H AND TEXACO rA5 STATION
<br />_ �L'1L-�� \�rYci cIJQ,•(� `'�.. /ja.(i nD.(v�..-: `F _
<br />7 VI nQ) ,SL1J� f�rX1 S {�ru�
<br />3 b / 11
<br />9 e J T ' LXe,.C��>Y c✓� t l7 ) SI Ve -s ye
<br />S:Y C C.i7p� U" )
<br />� ;_ <_c4�,-c�s�,.t_�vl `s
<br />0 J eo
<br />-'4
<br />' CFL (J
<br />-A
<br />��
<br />)C. r�tc_ S e_J -t/ e} fr o-� sf ..(- v`�
<br />eY
<br />f tip. �7
<br />yb�,tih
<br />o �
<br />' /.� • )1)i�� b•r1.,Q pili, �. 0'`\ Lj,!L \T
<br />/ / p � (j {:e._ , 1'�Kc S vy,
<br />�pi� ,{D f.C�,v` /h.,cl' c66(9c�(rrL 4•. `� c3 %n.c.n
<br />/'J-IAl� tLV7Pc�TV`'t._ 4�l Q
<br />t. (IJP �D,'�',T)0� GT�,Olu�1t �� �j�tl-.I�• m.� N
<br />MELENDEZ
<br />p -jt<
<br />ok<.•.,,ti
<br />_ �r�pai!a d r.��.n d- he- se,h,.,_:'(c�csF
<br />o!) � n (7
<br />ENVIEUMFNIAL 3RAIVN'FA
<br />i
<br />7035 H U)ILUM AVENIN! 1'111N1%fU141
<br />IIWMVION.C'A93324 ANNM'AIU, I'A ri339
<br />.IA.. (209) 552-0170 w. (209) 852.2034
<br />ENGINEER:
<br />"I'l-COMAS
<br />( MQCHIZUKI
<br />ENGINEERING
<br />2909 LARAND DRIVE
<br />MODES Y0, C'A 953
<br />MELENDEZ
<br />DESIGN
<br />GROUP
<br />I
<br />UFAKINCONS LT NIS ' voNRTAUCIK-w MANA(1RMP.NI
<br />ENVIEUMFNIAL 3RAIVN'FA
<br />i
<br />7035 H U)ILUM AVENIN! 1'111N1%fU141
<br />IIWMVION.C'A93324 ANNM'AIU, I'A ri339
<br />.IA.. (209) 552-0170 w. (209) 852.2034
<br />ENGINEER:
<br />"I'l-COMAS
<br />( MQCHIZUKI
<br />ENGINEERING
<br />2909 LARAND DRIVE
<br />MODES Y0, C'A 953
<br />(209)52, 1_52
<br />LIC. 019395
<br />CONTRACTOR:
<br />`p,.,a_�C-coA S�caClc� S��-�tan4�Co
<br />ROS A.. LA FAwr-L
<br />Sz-oclE-roN { ZA - CC S-2-0 s
<br />jet)Lkt-Lk -93T3
<br />t,-`cjl zjo0. IDS-
<br />dsSHEET
<br />SHEETTITLE
<br />REVISIONS
<br />No.
<br />Dal•
<br />By
<br />COnn�nf•
<br />1
<br />s
<br />99
<br />tz
<br />c.or+
<br />DRAWINGS PREPARED FOR:
<br />h SII
<br />PACIFIC
<br />CAR WASH
<br />4405 Pacific Avenue
<br />Stockton, Ca 95207
<br />d49) 478-5504
<br />oV 6f � ''L<''✓
<br />TNJ
<br />DRAWN RM
<br />, T
<br />CHECKED BY
<br />DATE
<br />CIV
<br />AL !a
<br />Ap SCALE
<br />63017
<br />,
<br />
|