Laserfiche WebLink
NEW UNDERGROUND FUEL 7AN1(5 <br />SEE SHUT F-3 FON DETAILS VAPOR LINE SLOPE TO LOWEST <br />AND SHUT F-6 FOR FOUNDATION GRADE TAN( ----I <br />00 O 00 O <br />14,000 UNLEADED .00 PREM <br />�I <br />2' FRP VAPOR LINES FROM---�th-� <br />EACH TANK TO VENT STACK I� <br />(SHOWN DASHED TYPICAL) <br />(2) 2' VENT RISERS <br />SEE SHEET F-4 FOR <br />DETAILS <br />Upon RrECOMERV AHO d <br />C)943 P, WAYII VES$O <br />PRODUCT DISPENSERS u/ CREDIT/DEBT <br />CARDREADER-, TYPICAL OF 2 T,4/ <br />IBdAc:iC3'TS i OPW 103AAA(Q•51?30 <br />P1T7/1Vlfii'iT1 <br />Log ur/ rt AIM <br />EXI5TING <br />BUILDING <br />T PIPING SCHEMATIC <br />MARK <br />SERVICE MOTOR <br />HEAD <br />PUMP SIZE STAGES <br />ELECTRICAL <br />Piece (209)1!1-0170 A. (109) 0{1.2021 <br />ENGINEERT <br />HP <br />FT <br />INCHES <br />VOLT PHA5E <br />NFG <br />MODES V0. CA 95155 <br />(209) 529-4652 <br />EJC. ('191Os <br />CONTRACTOR: <br />SHEET 717LE <br />® <br />DIESEL 1 1/2 <br />86 <br />NPT 1 208 1 <br />F.E.PETRO <br />® <br />CMG 1 1/2 <br />86 <br />NPT 1 200 1 <br />F.E. PETRO <br />ISG-�-UTR'0.3 DEL, UJAt-L 20.000 <br />GALLON SHIT 14,000 UNLEADED (,X,000 <br />PREMIUM STORAGE TANS TO REST ON A MIN <br />1'-0- PEA GRAVEL BED. PROVIDE A MIN OF <br />4'-0' CLEARANCE BETWEEN TOP OF TAN( TO <br />TOP OF FINISH GRADE. REFILL REMAINDER OF <br />EXCAVATION WITH PEA GRAVEL TO UNDERSIDE <br />OF CONCRETE TAN)' SLAB REFER TO SHEET F-3 <br />F-3 FOR DETAILS <br />00 O <br />14,000 UNLEADED <br />• • • <br />NEW FUEL ISLAND SEE <br />SHEET F-4 FOR <br />DETAILS <br />SEE TANK DETAIL SHEET FOR <br />LOCATIONS OF ALL FUEL CONNECTIONS <br />(2) 2- VENT RISERS <br />SEE SHEET F-4 FOR <br />DETAIL5 <br />.DRAtSseR W&,XTNH- v5w <br />-MORGAN BROTHERS' U <br />SHAPED BUMPER POSTS <br />TYPICAL <br />'A.D.5Ml"M1H 12' PRIMARY AND 3' <br />SECONDARY PRODUCT FRP LINES <br />TYPICAL <br />SEE SITE PLAN FOR <br />LOCATION OF EMERGENCY <br />SHUT-OFF SWITCH 4'-0' PC 0'-0' STEEL ISLAND <br />FORTIS AROUND RAISED CONCRETE <br />15LAND OPTIONAL ISLANDS <br />9"JLADLJ roYPtcal <br />p129NA12ly AaD C (;�aON[E <br />NOTE 4OlOATION C KO Cool IS <br />AOI R SQUIRED SVS UMP fLE. CONNLTOR <br />l PEER - ) <br />$CN 40 FRP BELL Y <br />MAEADEO FEMALE COUPON. <br />111 <br />aaANON Boor - <br />RU CON(C10R SLAPE 00. TO rANM <br />V4' PER Fr. MIN <br />n. <br />4' EXTRACTOR r tl)NG EO )' FRP p0' [L BGw <br />B3 PUT-AR.LbLQAPEP. <br />PHASE 0 VAPOR LINE CONNECTION <br />tWR�AL' <br />E' COMCREIE SLAB <br />' .. <br />X, <br />L <br />A. <br />PIPE TRENCH DETAIL <br />NOTE. SOLA M1O OT IS POT REQUIREDAINMrLF THC FLEA CONNECTOR <br />-A' AISEA 111 2' SOH 40 FRP BELL N <br />// THREADED FEMALE COUI <br />ISaATION SOOT <br />f tt[A CONN(PM I2 <br />r 4' I.TRACIOR 116.d n AY <br />1 --IBP FO <br />L/ J;DM Y FAP <br />_- AmoICA TCC <br />Y rRP <br />SUPREME U-NLEAPeP <br />PHASE II VAPOR UNE CONNECTION <br />SCAT CHIP' 8001 CO NECNON <br />10 Ca41uHMCHi SUMP <br />,LAC.,, <br />STAR C <br />CLAIMS <br />SCM. TED <br />FlA.UO NAT <br />PIPE DR / <br />LCMDUI? COMPRISSON RINC <br />IN 2La wuv <br />NllL <br />I. ULNG COUPRES&ON AND AS A WIDE. DRILL PIPE/CofawT NaE AND Bal <br />HOLES MRa4N SUMP wPAL PEA TABLE SELo«. <br />2 ASSEMBLE PMTS AS SNOW ABOVE. OMIGLML. NGagN ALL Bars A <br />".,114 STEEL CUM` r0 BO -IN LBS rGAME. <br />FLEXIBLE PIPE/COAOVIT NOTE CAR BOLT HOLE <br />00A, BOO? MDA -AL Sic LCC SEE <br />I E93015 2/4'r CONDUIT 2' 5/16'0 <br />,EB)100 1.0 COMOUt )' 5/4'0 <br />1[86100 2Y FRP PIPE a I/2' 5/16'. <br />1E BI N10 5.0 IRP PIPE 4 I/2' 5/4'0 <br />NOR SLAP AND PEHEMABOH5 OF SUMP SMALL BE wAIER NCNT <br />SUMP ENTRY DETAIL <br />(DRY HOLE IN5TALLATION) <br />II NNINADTMiRMIISINTATIONROF TNICFINALAPROeDUCT. 09NIR�AL CONTRACTO10 R TO RILOCATI, <br />CONIISiNNI WITH TN[ !NT(NTDOP,TM1 D93 ON. CONTRACTOR SMALL USE <br />DRAWING! ONLY AN AN.AID. CONTRACTOR SMALL COMPLY WITH ALL FEDERAL, STATE <br />-- AND LOCAL R90UIREM IS. <br />aPHASE 11 INSTALL 111 ONE DOUBLE MALL �qU_TFASNNTANK ' <br />AS FOLLOWS) 1410001 UNLLADSD.(aIr0005PREMIUM <br />3. TANK! SMALL It 1NSTALLI0 PER MANUFACTURER'! RICONMINDATIONS AND SPECS, <br />4. TANK BURIAL DEPTH !MALL It DETERMINED BY THE FOLLOWING N THOD <br />A. STARTING WITH THE PARTM13T PIPE BURIAL, WHETHER VENT LING! <br />FROM VKNT-0199AS OR PRODUCT LINES FROM D1S►9NS9MS ALLOW 1/46 PER FT. <br />SLOPE TACK 10 TANK TURBINE CONTAINMENT SUMP. <br />----- 4. ADD ADDITIONAL VERTICAL DROP FOR EACH !WINO JOINT, EQUIVALENT TO THE <br />DISTANCE BETWEEN THE CLNTIR LINES OF EACM FEMALE FITTING. <br />C. ADD 12' TO ARRIVE ATOP OF TANK. IN ALL CALLS MINIMUM BURIAL OF TANK <br />/, INSTALL BLACK IRON RISERS FOR PMAlt 11 VAPOR RECOVERY AND VENT <br />CONNECTIONS WITH EXTRACTOR TEE AND $ALL FLOAT VALVE PER DETAIL ON DRAWING <br />A. INSTALL TWO 121 1 1/2 HORSEPOWER SUBMERIIILE PUMPS <br />WITH PE PETRO STFMLD LEAN DETECTORS AND STP -CI CONTROL BOX <br />(MANHOLE COVERS TO 09 WATERTIGHT) <br />7. ALL PRODUCT LINES (2 P) AND SICONDARY CpOpeNTAINMENT 13'��E'1's?.o SMAS <br />ALL)*LUIS SMALL )SOP6.sKANL'ODLiU AATTAVAPOR LINES. IPIN0 AT VAPOR <br />Aa.5NrE1FRP PIPING ALL VENT! U► TO GRADE SMALL 14 I00M M97KANOL <br />COMPATIILN ALL NEW PIPING TO It INSTALLED PER MANUFACTURER! SPSCIFICATIONS <br />1. INSTALL 2' MANIFOLD VAPOR RECOVERY LINE$. SLOPE 1/4' PER FOOT INTO <br />MANIFOLDED 3' VAPOR RECOVERY LINE, !LOPED 1/40 PER FOOT INTO LOWEST ORAOR <br />TANK. RIPER TO SCHEMATIC DIAGRAM ON DRAWING, <br />9, INSTALL TWO 12) IS SINGLE WALL VENT LINE! ION[ FOR EACH TANK <br />COMPARTMENT) SLOPING 1/4' PER FOOT MINIMUM BACK TO TANK! IREPIR TO <br />SCHEMATIC DIAGRAMI <br />PIPING MATERIAL! TO 19 AIO.SNkWRP PIPING BELOW GRADE. GALVA <br />AT VENT RISERS A/OVt ORAD). <br />10. -INSTALL ANNULAR SPACK14NITIR (MANHOLE COV9R TO It WATERTIGHT) <br />11, INSTALL (2) NEW MULTI PRODUCT DISPENSERS (MPD'S) WITH INVERTED COAXIAL <br />12, IMIROLNCY PUMP SHUT-OFF SWITCH 19TW99N 2/' AND 71' FROM PUMF ISLAND <br />SII WS PLAN, <br />13. INSTALL V4?PeP•RS r3Ao G -L Tfwlc R4aLlTTGEz pRNQI- w( rwo (Azo e5 <br />t (AUDI MACON, FLOAT CAP. 4 SUMP !INSOR. 2 ANNULAN IENDORS <br />f 4 - OUTPUT RELAY INSTALL MIR MANUFACTURERS INSTRUCTION!. <br />START-UP BY S -S,5 tr,. .ec5,: OR APPROVED KA1NT[NANCI <br />CONTRACTOR!, <br />FRP <br />ELBOW <br />80.12 NII IIIHC <br />I' fLCPrOMi IVA[ \\ IOC(pMMILE <br />A[mN WR[i <br />1/1' uu. NLiI"� r . <br />fWs, L, nrUAF OPOSEO wOHO <br />CIFLI . / [,-APPLY A(9H 10 FLN4[ <br />P <br />COHMMIr M4 TM@ <br />I- l A P. <br />Hale: <br />1lL Goss 6vte PIP Po ENO ID 6e u0-[ nnNc ;OV UD IMLASApp <br />Y.DE V„Tn LL R LLL: <br />NI full MIW.4f 4w5 .T , IU <br />Q-IPPIE AIU ,5 Ill. rWr INLW. ALL 1111, 4 N� <br />'WALOP 1000 <br />POPUM® cn0000vpm roidvaoR., <br />GINSIAL MOTH <br />IA NEPA 27 A 30 TELT REQUIRED ON BOTH THE PRIMARY AND <br />SECONDARY CONTAINMENT SYSTEM oR PSR So,,i it AHN y,I AO c,_ fsoLwTs ,L <br />DEPT• <br />2. NFPA PRECISION TEST REQUIRED UPON COMPLETION OF <br />INSTALLATION. 09 PCP- e.NU. HeALTN Der'C ", <br />3. ELECTRICAL 70 It CONNECTED TO NEW MIRE OUTTER AT FACE <br />W BUILDING. COORDINATE W/ OWNER FOR LOCATION l <br />4, L9AK DETECTION SYSTEM BY 'INCON' OR EQUAL <br />0. THI PRIMARY STEEL TANK 15 U,L. 10 LISTED. <br />6. 340 SECONDARY CONTAINMENT 15 200 MIL THICKH INOMINALI <br />FIBERGLASS REINFORCED PLASTIC. Sex• AAF SPeT-I FI�ArtoFNJ <br />7. INSTALLATION SMALL COMPLY WITH ATTACHED INSTALLATION <br />INSTRUCTIONS TANK SHALL 11 PLACED ON A BIDDING OF 3/4' <br />OR SMALLER ROUNDED ACORKOA190 PIA 4RAVIL.I'-0' MIN DEPTH <br />0. TANK 15 DELIVERED WITH INSTALLATION INSTRUCTIONS AND A GAGE <br />TABLE, ONE STICK 15 PROVIDED PER INSTALLATION. ONE END OF <br />TANK 15 LAIILID WITH SHIPPING WEIGHT. OALLONS A U.L. No. <br />A STEEL TANK MIN. MATERIAL THICKNESS. <br />9. ALL PRODUCT LINES ARE TO BE 5ECONDARY CONTAINED. <br />10. PERPENDICULAR PENETRATION OF THE CONTAINMENT SUMPS <br />ARE PREFERRED 20 15 THE MAXIMUM ALLOWABLE PENETRATION <br />ANGLE. <br />11. ALL STLIL TANK RISER! B FILL AND DISPIN$IR PIPING FITTINGS <br />ARE TO It SCH 40 GALVANIZED PIPE. ►RIMI AND WRAF ALL STEEL <br />PIPING AND RISILAS. <br />12. ALL PIPING MUST UNDIROO A TIGMINISS TEST, BY AN APPROVED <br />METHOD. PRIOR TO FINAL APPROVAL OF INSTALLATION. <br />Him? MOTH <br />PHASK I <br />RIMOVI 1X1STINO PULL TANK! 131 AND ALL AILA71D PIPING <br />AND DISPINSIRS, <br />PHASE 11 <br />1. INSTALL INS <br />UFCTIIS IRUNALLWAS <br />MULTI PRODUCT <br />MONITORING, POWER CIRCUITS AND CONT OLSIAND ALLIRILAIND. LEAK <br />ACCISSORIISI POWER CIRCUITS) ITC. AND PLUME ONE (1) FOR PUTUR9 <br />UTI, <br />0. INSTALL NEW VINT RISERS FROM TANK TO VENT STACK VENT !TACK TO <br />LOCATED NIXT TO 019296 DISPENSER VMIFY IXACT LOCATION <br />WITH OWNER. <br />M-1:;►ENDEZ <br />DESIGN <br />GROUP <br />CAMOMcUNR D nu nNI <br />• 6NVIREMIPXFAI. SKRVKFA <br />10)111U(111RUNAVFNUI! 1•I1IN)X 114141 <br />IIUOIMMMH, CA 95II11 ANIUFAID. 1'A 41111 <br />Piece (209)1!1-0170 A. (109) 0{1.2021 <br />ENGINEERT <br />THOMAS <br />MOCI-IILUKI <br />ENG INEER ING <br />2909 LARAND 1)RIVI: <br />MODES V0. CA 95155 <br />(209) 529-4652 <br />EJC. ('191Os <br />CONTRACTOR: <br />SHEET 717LE <br />,BJP 015 <br />S r SrJ A ;J '1' J r <br />REVISIONS <br />No. <br />Date <br />By <br />Coeloonis <br />DRAWINGS PREPARED FORT <br />rI � <br />I '• • <br />'1111 <br />PACIFIC <br />CAR WASH <br />4405 Pacific Avenue <br />Stockton, Ca 95207 <br />9) 478-5504 <br />RA RM'•r.:$,: <br />EET <br />533 <br />� <br />CHECKED B <br />DATE D ' <br />SCALE , L - - <br />1'=10' 0 <br />)J �� <br />JOB 9"J 3017 <br />/ <br />