My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_TANK TOP UPGRADE 1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
2300 - Underground Storage Tank Program
>
PR0231217
>
INSTALL_TANK TOP UPGRADE 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 3:36:27 PM
Creation date
11/6/2018 9:15:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
TANK TOP UPGRADE 1994
RECORD_ID
PR0231217
PE
2361
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\4707\PR0231217\TANK TOP UPGRADE PLAN 1994.PDF
QuestysFileName
TANK TOP UPGRADE PLAN 1994
QuestysRecordDate
11/4/2011 8:00:00 AM
QuestysRecordID
179296
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i • f,�c f��e. aPy <br /> M E M O R A N D U M <br /> TO: Mr. Stan Iverson, Tait & Associates <br /> FROM: Pam Violett, San Joaquin County Environmental Health Div. <br /> DATE: July 18, 1994 <br /> RE: Conditions of approval for piping/monitor relocation <br /> Unocal #6982 , 4707 Pacific Avenue, Stockton <br /> 1. If any visible signs of soil contamination are observed during <br /> excavation or construction, soil sampling shall be performed <br /> under inspection by Environmental Health Division (EHD) . <br /> 2 . An as-built letter shall be submitted to EHD by the <br /> appropriate party (consultant or contractor) indicating <br /> whether Ameron or A.O. Smith piping was installed to match <br /> existing and any other changes that occurred during project. <br /> 3 . The newly installed primary and secondary piping will be <br /> required to be soap tested, under pressure, and witnessed by <br /> EHD. A complete piping pressure test performed by a third- <br /> party testing company shall be required once the station is in <br /> operating condition (i.e. concrete completed, etc. ) , and a <br /> copy of test results submitted to EHD before station will be <br /> allowed to reopen. <br /> 4 . All monitor functions shall be demonstrated to EHD to verify <br /> that unit is in proper working order upon completion of <br /> relocation. <br /> 5. A City of Stockton Fire Department permit may be required for <br /> this project. If so, the permit number shall be submitted to <br /> EHD before the project begins. <br />
The URL can be used to link to this page
Your browser does not support the video tag.