Laserfiche WebLink
0 b <br /> BOARD OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> Jamse Culbertson, Pres. + SERVINQ <br /> Patricia E. Vannuccl, Secy. City of Lodi <br /> Anlhonelle Ven Spronsen 1601 Fast Hazelton Avenue, P. 0. Box 2009 San Joaquin County <br /> Earl Plmentel Stockton, Callfornla 95201 City of Eacalon <br /> Fern Supbee City of Manteca <br /> Daniel L. Flores 209/466-6781 City of Ripon <br /> John O. Maat, M.O. City of Stockton <br /> William J, Wade Jopl Khanna, M.O., M.P.H., District Health Officer City of Tracy <br /> Mary Anna Love S1-Miel San Joaquin County <br /> San Joaquin County <br /> Faci1 ity Namecra,�vr/i�Uf✓/TJ e4 Le <br /> Address ✓``-/ s--/ !ic- iGj c 2 �;/c'�r/ lid s o/7 <br /> Date of Inspection 11—Z ff4`7 Inspector l � <br /> MONITORING ALTERNATIVE #7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquid, level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This <br /> /monitoring alternative shall include: <br /> V 'Annual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. p <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> V Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2552 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> Precision test(s) must be performed by -30 Zand results <br /> office within 30 days of the test. e alts submitted to this <br /> 2. Tank gauging must be started immediately. (See instructions above). <br /> ) <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />