My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL TANK TOP UPGRADE PLAN 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
INSTALL TANK TOP UPGRADE PLAN 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:23 AM
Creation date
11/6/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
TANK TOP UPGRADE PLAN 1998
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\6633\PR0231784\TANK TOP UPGRADE PLAN 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48' <br /> NOTE: � <br /> HIGH HOSE RETRACTOR 1. SUPREME NOZZLE MUST ALWAYS BE ON THE LEFT, <br /> 2. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER SUMP FROM THE OPPOSITE SIDE OF THE - <br /> HOSE BREAKAWAY 68 CONDUIT. <br /> 3. PLUG ON VAPOR SHEAR VALVE MUST BE ACCESSIBLE. <br /> 4. USE RIGID PIPE (INSTEAD OF HOSE) FOR VAPOR INSIDE ALL DISPENSERS. <br /> 5. INSTALL VAPOR SHEAR SUPPORT FROM TOP OF SHEAR VALVE TO DISPENSER. <br /> ® 6. PULL BACK REDUCERS IN DISPENSER BOXES AFTER SECONDARY PIPE HAS BEEN TESTED. <br /> DISPENSER 66 OR 87 EXPLOSION PROOF JUNCTION BOX m 0Q <br /> FILTER SEAL OFF <br /> 1 1/2'0 SCH. 40 BLACK IRON <br /> PIPE RISER PIPE CAP WITH ROLE FOR <br /> CONTAINMENT PROBE WIRE <br /> 1 1/2" N.P.T. INLET UNION DISPENSER NOZZLE 68 <br /> (BY DISPENSER MFG.) SEAL ALL OPENINGS WATER TIGHT ❑ <br /> DISPENSER NOZZLE SYAVEL <br /> FILTER CHANGE TRIP TRAY SLOPE CONCRETE <br /> (BY DISPENSER MFG.) 1 1/2" PER FOOT <br /> TESTING: <br /> DPW DUAL POPPET IMPACT VALVE — AWAY FROM <br /> (SHEAR SECTION TO BE FLUSH DISPENSER (TYP.) <br /> WITH TOP OF DISPENSER ISLAND) 71 a a n� 'e 4. ! �' 1. FILL DISPENSER SUMP WITH WATER UP TO HIGHEST PENETRATION. <br /> 'c•. a :w REMOVE WATER WHEN DIRECTED BY CHEVRON PROJECT MANAGER. <br /> • ' • .d ,�. ^ !, a t d,. :• ' NOTE, <br /> �' d I 1. DISPENSERS SHOWN HAVE A SIDE HOSE MWNT. 2. WHEN TESTING PRODUCT LINES, INSTALL STEEL CAP ON OPEN <br /> • SHEAR VALVES TO AVOID DAMAGE TO THE VALVE. <br /> I • • d d. TOP HOSE MOUNT IS AVE AVAILABLE. <br /> 3/4" P.V.C. PUMP OUT PIPE STABILIZER BAR 73 1 2.SUPREME SIDE OF DISPENSER MUST ALWAYS BE ON THE LEFT, <br /> WITH THREADED FlTTING BRACKET EXTENSION <br /> SUMP F.R.P. DISPENSER CONTAINMENT SYSTEM 69 <br /> FOR CONDUIT ATION BOOT 99 <br /> 70 1 DISPENSER ELEVATION - DRESSER WAYNE XV590 ig <br /> 45' BLACK IRON ELBOW 1" CONDUIT TO CONTROL 1/2'-1'-0" <br /> PANEL (POWER) <br /> SLOPE 1" CONDUIT TO CONTROL SIDE 'B' (PRODUCT AND VAPOR PIPING SIDE) <br /> PANEL (DATA) <br /> ° I 3/4" CONDUIT TO CONTROL 481, <br /> PANEL (SPEAKER) 24" 24" <br /> 0 0 -- <br /> i 3/4' CONDUIT FOR CONTAINMENT 21" 21" <br /> 2 1/2" MINIMUM CLEARANCE I BOX PROBE TO MONITOR PANEL <br /> BETWEEN FITTING & PIPE BRACKET 9" 10 1/2" 10 1�2" 9" <br /> 2'0 F.R.P. PIPE 18 (DO NOT PENETRATE SUMP) 3/4' x 1 1/2' <br /> 3" P.V.C. PIPE OPEN AT BOTTOM. SLOTS (8) 2 1�2^ 01 <br /> 3 8° i6" - 1" N.P.T. VAPOR <br /> ATTACH TO CONTAINMENT BOX PROVIDED INLET RECOVERY OUTLET <br /> AS NEEDED FOR SUPPORT, FOR ANCHOR <br /> 3'0 F.R.P. PIPE 19 DISCRIMINATING SENSOR 96 BOLTS <br /> 6 1/2" SUMP PENETRATION BOOT 0 1 1/2'M SWIVEL x 2"F x 24" - - -r - - -I <br /> MINIMUM FLEXIBLE CONNECTOR, ALTERNATE <br /> CLEARANCE FLEXIBLE CONNECTOR WITH ELBOW <br /> 3' TO 2' REDUCER BOOT <br /> BETWEEN WITH TEST PORT O UUSSEAPPROVED NON-HARDENING I 2 4' o <br /> (ROLL BACK BOOT AFTER TESTING) 74 I +— _ N <br /> JOINT COMPOUND M _ —FOR THREADED CONNECTIONS. °ry � ( 4 1 4 N <br /> _ _ p <br /> PRODUCT 2" BELL & MALE F.R.P. w a - I I <br /> THREADED ADAPTOR _ _ 00 <br /> I <br /> 3/4" N.P.T. <br /> CONDUIT 3" 3" <br /> (SPEAKER OPT.) <br /> '1.0" INLET _._ 13 1/2 1' N.P.T. CONDUIT <br /> NOTE' 'HI' INLET SIDE 'A' <br /> 1. CONTRACTOR TO FIELD VERIFY DISPENSER BASE DIMENSIONS. ((CONDUIT SIDE) <br /> 2.PRODUCT ORDER SHOWN IS TYPICAL, NO OTHER VARIATIONS ARE ACCEPTABLE. <br /> DISPENSER <br /> GENERAL CONTRACTOR TO PROVIDE 2 DISPENSER BASE - DRESSER WAYNE XV590 <br /> RIGID PIPING TO EACH VAPOR RECOVERY <br /> MANIFOLD <br /> 1 1/2' x V DPW DUAL POPPET <br /> VAPOR SHUTOFF VALVE <br /> (SHEAR SECTION TO BE FLUSH <br /> WITH TOP OF DISPENSER ISLAND) 72 <br /> 45' BLACK IRON ELBOW <br /> 6" MINIMUM PEA GRAVEL <br /> COVER OVER F.R.P. PIPE <br /> 7 1/2"M SWIVEL x 2"FX 24" <br /> FLEXIBLE CONNECTOR <br /> SLOPE / USEAPPROVEDNON-HARDENING <br /> JOINT COMPOUND FOR THREADED <br /> CONNECTIONS. <br /> 2'0 F.R.P. VAPOR RECOVERY PIPE 20 —2" BELL & MALE F.R.P. <br /> SUMP PENETRATION BOOT 98 — THREADED ADAPTOR <br /> Chevron U.S.A. Inc. (*Chevron) owns the copyright rights to the design of the herein described fueling a <br /> system as embodied In any tangible or electronic medium of expression including oil building <br /> NOTE: designs, architectural plans and drawings. The copyrighted material Includes the overall farm as well as <br /> 1. MOUNT VAPOR SHUTOFF VALVE USING PHIL-TITE VAPOR RECOVERY the arrangement and composition of spaces and elements in the design, but does not include individual Q- <br /> VAPOR IMPACT VALVE SUPPORT KIT. standard features, Anyone who wishes to copy, distribute or sell this drawing or any derivative works III <br /> hereon must hove the prior written consent of Chevron, except for copies made for the sole �- <br /> purpose of preparing construction drawings for Chevron branded facilities and ail such copies sholl be Q <br /> returned to Chevron upon request. <br /> ©1995 Chevron U.S.A. Inc. All rights reserved. <br /> The drawings, calculations, and any specific reference to equipment, materials or components, W <br /> if Included herein, are generic and not designed for site specific applications. Chevron does not warrant <br /> or guaranty the accuracy, completeness, merchantobisty, intended use or applicability of such drawings, <br /> — - calculations, and any referenced equipment, materials or components, to the requirements or Q <br /> 3needs of your site or local area. Consult a registered architect or professional engineer to determine <br /> DISPENSER CONNEC11ON AND PIPING (HARD) any site adesign, applicability, accessibility, building code, municipal requirements and any and <br /> all applicableble federal, stets and serol statutes, rules and regulations which may affect your site. <br /> SCALE <br /> Chevron does not protide these services. <br /> NO Q <br /> W <br /> DISPENSM SUMP APD PPM MAU = <br /> Chevron 9-617 <br /> Marketing 6633 PACIFIC AVENUE <br /> STOCKTON, CALIFORNIA <br /> ROVIBIpI! SCALED U4"-T-O' DATE20NOV97 <br /> DR F' h' '. OR !. t '� APP. <br /> 8FEET <br /> -_ __ F 3.20 �/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.