My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7303
>
2300 - Underground Storage Tank Program
>
PR0231226
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:21 AM
Creation date
11/6/2018 9:44:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231226
PE
2361
FACILITY_ID
FA0003814
FACILITY_NAME
TOSCO CORPORATION #30878*
STREET_NUMBER
7303
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07736021
CURRENT_STATUS
02
SITE_LOCATION
7303 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7303\PR0231226\COMPLIANCE INFO 1987-2013.PDF
QuestysFileName
COMPLIANCE INFO 1987-2013
QuestysRecordDate
8/11/2017 4:01:18 PM
QuestysRecordID
3571947
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 8, 1993 <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />I. WRITTEN MONITORING PROCEDURE <br />1. Site Name Unocal SS # 5421 <br />2. Site Address 7303 Pacific Ave. Stockton CA 95207 <br />3. Describe the frequency of performing the Monitoring Method. <br />Continuous Monitoring System <br />4. What Method and equipment will be used for performing the <br />monitoring. <br />Double Wall tanks with Leak Alert LA -08 and Double Wall <br />product lines. <br />5. Describe the locations where the monitoring will be performed. <br />. .. .,f +ha tankG <br />6. List the name(s) and title(s) of the person(s) responsible for <br />performing the monitoring and\or maintaining the equipment. <br />Water S Orr - Operator <br />Maintenance Department - Unocal <br />7. Reporting Format - <br />8. State the Preventive maintenance schedule for the monitoring <br />equipment. Note: The maintenance schedule shall be in <br />accordance with the manufacturer's instructions. <br />Yearly service and maintenance work is recommended by the <br />manufacturer. <br />9. Describe the training needed for the operation of both the tank <br />system and the monitoring equipment.___, <br />i,. ,o ata the tank <br />contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.