My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7303
>
2300 - Underground Storage Tank Program
>
PR0231226
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:21 AM
Creation date
11/6/2018 9:44:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231226
PE
2361
FACILITY_ID
FA0003814
FACILITY_NAME
TOSCO CORPORATION #30878*
STREET_NUMBER
7303
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07736021
CURRENT_STATUS
02
SITE_LOCATION
7303 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7303\PR0231226\COMPLIANCE INFO 1987-2013.PDF
QuestysFileName
COMPLIANCE INFO 1987-2013
QuestysRecordDate
8/11/2017 4:01:18 PM
QuestysRecordID
3571947
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unocal Petroleum Products <br />' E Chemicals Division <br />• U:.ocal Corporation <br />911 Wilshire Blvd.. Suite 1128 <br />Los Angeles, Calilomia 90017 <br />. , Telephone ( 977-5862 <br />213) 977-5389 <br />FOCAL 7b <br />Facility r <br />Address <br />Monitor L zt' <br />I. Verify Intrinsic Safety <br />Date I0_1k_q' <br />Proper field wire termination. <br />Complete isolation of I.S. field wiring from any <br />other wiring. <br />II. Proper Panel Installation <br />Panel mounted in non -hazardous area and accessible <br />to owner/operator. <br />�X All field wiring is labelled at terminal strip. <br />All wiring brought through appropriate punch outs. <br />III. Check for Proper Probe Installation <br />�C Piping sump sensors suspended within on inch of <br />sump bottom. <br />X Double walled FRP sensors installed properly in <br />tank and where applicable, pull strings installed <br />and accessible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.