My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
REMOVAL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:31 AM
Creation date
11/6/2018 9:55:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2007
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7647\PR0231227\REMOVAL 2007 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> 2.0 PROJECT SAFETY PERSONNEL <br /> 2.1 Safety Personnel <br /> The Project Consultant is responsible for the preparation of this Health and <br /> Safety Plan, and is to monitor compliance with provisions herein of its personnel, <br /> subcontractors and visitors to the site. The Project Consultant is responsible for <br /> the distribution of this health and safety plan. The Project Managers and/or <br /> Project Consultant are responsible for the compliance of the Health and Safety <br /> Plan. <br /> The Project Consultant is responsible for delivering the plan and any addenda to <br /> all Sub-Contractor's Project Managers' and for advising them on the health and <br /> safety provisions of this plan. Any Sub-Contractor's Project Manager's with the <br /> approval of the Project Consultant, can suspend work or modify work practices <br /> for safety reasons, and to dismiss individuals whose conduct on-site endangers <br /> the health and safety of others. <br /> The Project Managers' are responsible for distributing the plan to all field <br /> personnel under their jurisdiction and to an authorized representative from each <br /> firm contracted to assist with on-site work. The Project Managers' are also <br /> responsible for implementing the provisions of this plan and its addenda. <br /> Implementation will include training of field personnel involved with the project, <br /> and provision for the appropriate safety equipment. <br /> The Project Consultant is responsible for assisting the Project Managers' with <br /> on-site implementations of this Health and Safety Plan. His responsibilities <br /> include: 1) inspecting safety equipment supplies, 2) performing air quality <br /> measurements when required or needed, 3) directing decontamination <br /> operations and emergency response operations, 4) setting up work zone <br /> markers and signs if such zones are specified in the Health and Safety Plan, and <br /> 5) reporting all accidents or incidents to the appropriate authorities. <br /> Health and Safety Plan Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.