My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PARK
>
540
>
2300 - Underground Storage Tank Program
>
PR0505628
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 4:11:29 PM
Creation date
11/6/2018 10:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505628
PE
2381
FACILITY_ID
FA0006907
FACILITY_NAME
REICH, BILL
STREET_NUMBER
540
Direction
W
STREET_NAME
PARK
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
540 W PARK ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PARK\540\PR0505628\COMPLIANCE INFO 1995.PDF
QuestysFileName
COMPLIANCE INFO 1995
QuestysRecordDate
10/13/2017 5:31:29 PM
QuestysRecordID
3678992
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 540 W. Park St. , Lodi CA <br /> Phone No. <br /> Owner Bill Reich (209)334-2354 <br /> Contractor JIM THORPS OIL, INC-I— <br /> INDICATE <br /> No. (209)3b8-6175 License No.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load lifts.icket,within 30 days of project completion that one of the following materials <br /> was placed in the excavation 1 <br /> A. Pea gravel--smooth, rounded material not more than one-half (1/2) inch in diameter . <br /> B. Crushed rock--self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> ction ct <br /> or <br /> sion <br /> I herebycertify th ta Soil the select material ompdescrahed at ve wrill be p1 ced atbe ta m nim m of fted within 30 ive(5�us oflb c yards per o1000 gallontank <br /> of verifcation that <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> * JIM THORPE OIL,INC. <br /> ame ( rint) <br /> *=ignature <br /> I e 1`1* <br /> Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.