Laserfiche WebLink
p soon <br /> tsooR <br /> Cr ! <br /> i <br /> f <br /> S n naRa a > <br /> cd 10= <br /> AHCO Products k.... ompdnys 6 ¢y� <br /> Mle,.,i_ Cway a WV Wgdo Rd iii •0 /W) A\ 1 <br /> All <br /> .. Ay.etlUct�" � V •� O <br /> wi <br /> SITE O C a(0 <br /> Dispenser and Piping Modification U W ` 1. <br /> �. ., <br /> x , � <br /> U � Uv <br /> aLqT ('0 <br /> VICINITY MAP 0 p O <br /> COMPLIANCE NOTES: PROJECT DATA CO <br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR SCOPE OF WORK <br /> REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT O 0 <br /> f+ O <br /> LOCATIONS. THE SCOPE OF WORK FOR THIS PROJECT IS TO PROVIDE <br /> COMPLIANCE WITH NEW SB 989 TESTING REQUIREMENTS AND WILL U Y <br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE INVOLVE THE FOLLOWING. REMOVE AND REPLACE THE <br /> FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO UNDERGROUND GASOLINE AND VAPOR RECOVERY PIPING WITH NEW c i�� <br /> THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE AND INSTALL NEW DIPENSERS. INSTALL NEW UNDER DISPENSER G <br /> PROCEEDING WITH THE WORK. CONTAINMENT AND SENSORS AND A NEW MONITORING SYSTEM _ <br /> CONSOLE. REMOVE AND REPLACE PORTIONS OF THE <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF UNDERGROUND STORAGE TANK TOP EQUIPMENT. THE EXISTING •N <br /> INDUSTRIAL SAFETY, STATE OF CALIFORNIA , FOR EXCAVATIONS OF TRENCHES FOUR UNDERGROUND STORAGE TANKS ARE TO REMAIN. Z G <br /> 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. It _ <br /> GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING PROJECT OWNER: ARCO PRODUCTS COMPANY ACd <br /> AGENCY PRIOR TO TANK INSTALLATION. OWNER'S ADDRESS: 4 CENTERPOINTE DRIVE LL <br /> TANK SYSTEM BE INSPECTED BY GOVERNING AGENCY AND ARCO ENGINEER AT 'S PHONE NO: (714) 670-5300 <br /> FOUR (4) SEPARATE <br /> LA PALMA, CALIFORNIA 90623-1066 Cd <br /> ATE CONSTRUCTION PHASES AS REQUIRED: OWNERJ <br /> PROJECT ADDRESS: 25775 S. PATTERSON PASS ROAD <br /> 1. PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 TRACY, CALIFORNIA <br /> MINUTES. OCCUPANCY: M (BLDG.), S-3 (CANOPY) C <br /> 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN CONSTRUCTION TYPE: V-N O <br /> ACCORDANCE WITH MANUFACTURER'S GUIDELINES. SITE AREA: 57,212 S.F. -6-13. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE CONVENIENCE STORE AREA: 1,923 S.F. ,W <br /> HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS CANOPY AREA: 1,806.6 S.F. U <br /> TO INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE ARCO FIELD ENGINEER <br /> MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION TEST CHECKLIST <br /> BEFORE CONTRACTOR WILL BE PAID. <br /> 4. FINAL INSPECTION, INCLUDING ALL PORTIONS OF THE LEAK DETECTION O <br /> SYSTEM. C <br /> TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS 2 <br /> FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM Tt1 <br /> BEING PLACED IN OPERATION. C <br /> ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE '�DRAWING LIST Cd <br /> 0 <br /> AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING 0 <br /> AUTHORITIES. T-1 - COVER SHEET <br /> C1-1 - DEMOLITION PLAN a' <br /> GENERAL NOTES: CA1-1 - MISCELLANEOUS SITE DETAILS 1 o <br /> TK-1 - PETROLEUM PIPING PLAN C C m <br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON TK-2 - EXISTING DOUBLE WALL FIBERGLASS TANK Cd 0 >, <br /> ARCO TANK DRAWINGS (1K-SERIES) AND ARCO MASTER CONSTRUCTION fn o <br /> TK3-1 — SUMP AND VENT PIPING INSTALLATION DETAILS <br /> SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). L_ a <br /> TK3-2 - SIPHON PIPING INSTALLATION DETAILS A` o <br /> B. THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO TK3-3 - PIPING INSTALLATION DETAILS AT W G Cd <br /> BE AN EXACT REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR Q L <br /> SHALL RELOCATE MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTENT MULTI-PRODUCT DISPENSERS w <br /> WITH THE INTENT OF THE DESIGN, THE GENERAL CONTRACTOR SHALL PREPARE TK3-4 - TYPICAL MULTI-PRODUCT DISPENSER INSTALLATION Uj U <br /> AS-BUILT PLANS AT THE COMPLETION OF THIS JOB. TK3-5 - TANK SLAB, IDENTIFICATION MARKING Q LO >+ 0 - <br /> C. INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS TK4-1 - VEEDER-ROOT LEAK DETECTION CO N U > a <br /> AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL AND DISPENSER WIRING DIAGRAM <br /> CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. LO L. <br /> AND LOCAL REQUIREMENTS. (WAYNE 2/V580) D N UOO <br /> D. ARCO SHALL PERFORM LINE TESTING AND AIR QUALITY TESTING. <br /> TK4-2 - TANK ELECTRICAL SCHEMATIC DIAGRAM <br /> CONTRACTOR REPRESENTATIVE SHALL BE PRESENT DURING TESTING. TK4-3 - MATERIAL LIST, ABBREVIATIONS, <br /> E. FENCE JOB SITE WITH 6 FT. HIGH CHAIN LINK FENCE DURING TANK ORIENTATIONS AND GENERAL NOTES. <br /> CONSTRUCTION. <br /> m <br /> N Q <br /> F. UTILIZE EXISTING ELECTRICAL/SIGNAL CONDUIT WHEREVER POSSIBLE. `V n <br /> REPLACE/ALTER/INSTALL NEW CONDUIT AS REQUIRED. REPLACE DETERIORATED <br /> CONDUIT AS REQUIRED. PO ui 2 v< < . <br /> G. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED ¢ 2 in 9a o $ <br /> OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION. N m .a N <br /> rn 2 'C c-0 <br /> H. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. noo 0 <br /> m <br /> o <br /> R 20 � mm <br /> 1. INSTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.J.) IN ALL NEW r c6V N fr <br /> CONCRETE WORK AS SHOWN AND REQUIRED. <br /> master release date <br /> J. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL <br /> DISCONNECT ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PER <br /> N.E.C. 514-5. <br /> K. IF STRONG ODOR OF GASOLINE OR DIESEL FUEL IS PRESENT IN EXCAVATED NO. DATE REVISIONS PROJECT RELEASE prof, axe. drawn by <br /> MATERIALS, STOCKPILE CONTAMINATED MATERIALS ON PLASTID FILM AND COVER PERMIT 11/08/01 DBS <br /> WITH SAME. NOTIFY ARCO ENVIRONMENTAL ENGINEERING FOR DISPOSAL. project facility <br /> COORDINATE ALL ENVIRONMENTAL MATTERS WITH: PAUL SUPPLE, ARCO <br /> ENVIRONMENTAL ENGINEERING. PHONE: (510) 299-8891. PROVIDE ALTERNATE BID 6100 <br /> BID ITEM: UNIT COST ($/CUBIC YARD) FOR OVER-EXCAVATION WORK. <br /> CONST. sheet / file <br /> AS—BUILT T-1 <br /> of <br /> ARCO/AR7402/CVR.DWG <br />