U I © PIPING INSTALLATION NOTES: ® PIPING INSTALLATION NOTES:
<br /> 15 CONTRACTOR SHALL PATCH AND/OR REPAIR EXISTING A.0 PAVING ALL CGIISTRUMM IS E>OSIM AND TO REMAN UNLESS N070
<br /> UNAUTHORIZED CHANGES AND USES: The engineer preparing these AND CONCRETE AS REQUIRED BY NEW WORK. ALL WORK SHALL Off'
<br /> plana will not be resp. Ible for, or Ii for unauthorized
<br /> for, unauthorized than a to or uses of th a plans. All changes I CONFORM TO ARCO SPECIFICATIONS. ypjE„T'Q INE CON•IRAC7GIt SHALL MAINTAIN AND PROJECT E70SRNG
<br /> plana must unauthorized d writs g and must ne app ve i by the pchan er ��"� SHALL SLURRY SEAL AND RESIRPE ENTIRE SI7E CANOPY allW S. FOGIM AND SHROUD FINISHES N PLACE
<br /> of these plans. AREA UPON OOIIPlETiON OF WORK. SLURRY SEAL SHAM- BE
<br /> SCHEDULED TO BE FAD 3T1 DAYS AFTER COAtPLEROFI OF THE CONTRACTOR SHALL REPAIR OR REPLACE CANOPY
<br /> conatro.tio[' cohiraoio agrees that In accordance with g ally WORK. 1HE STAl10N WAL REMAN N OPERATION BY STAGING THE RANWAiER LEADER DAMAGED BY ISLAND RElIWVAL, SEE SHEET
<br /> accepted construction practices, construction contractor will be I �'AT—i' �'
<br /> required to assume ole and complete responsibitiy for job site K"
<br /> conditions during the course of construction of this project,
<br /> Including safety of it persons and property, that this requirement 16 RECONNECT CANOPY DOWNSPOUTS AS REQUIRED BY NEW WORK. VAPOR AND VENT PNRIfi IS lb Si-OPE AT / PER F00 • .� >C, O
<br /> shall in made fo gpply continuously and no} limited to normal $NINON PIPING IS TO SLOPE 1/4e PER FOOT. � Z
<br /> working hours, an construction contractor further agrees to �"
<br /> co
<br /> defend, idemnify and hold design professional harmless from any — — — — — — — — - 17 CONTRACTOR SHALL INSTALL NEW TWO-POINT, 4" FILL AND L
<br /> and all liability, r4al or alleged, to connection with the performance -_ — — — — — — — STAGE I VAPOR RECOVERY SYSTEM. REPLACE EXISTING RISERS SECONDARY CONTAINMENT PMMtKi N SHOWN BY NOTE OIN.Y. NOT (�'� !�
<br /> of work on this project, excepting liability arising from sole AND INSTALL ADDITIONAL HARDWARE AND FITTINGS AS REQUIRED. ORAPFIL"ALLY. ALL PRODUCT PIPMW TO BE DOUBLE CONTAINMENT /�"� O 0 U)
<br /> negligence of design professional. ❑ ❑ !F::-Ijl ,
<br /> TYPICAL OF 4 TANKS. REFERENCE SHEET M-2. T M VAPOR RECOVERY AND VENT PIPING TO EE SNG E WALL ii. _ �r IEagtneen Note18 INSTALL NEW VEEDER—ROOT TLS-350 TANK MONITOR UNIT. E'" •� • C
<br /> the existence nd location of any underground utilities, pipes, LOCATE AS DIRECTED BY ARCO FIELD ENGINEER. i= ALL NEW PPNIG SHALL 8E INSTALLED PER MANUFACTURER'S
<br /> and/or struct rsa shown on t RECOMMEHDARONS AND NSTALLAIM 161RUCTION5 (�
<br /> search of are
<br /> table records. o the begt.,of our knowledge, there o 0 0 0 0 VEEDER-ROOT WAL PROVIDE P06171VE SHUT DDWN. /I 1
<br /> are no of are g table
<br /> record t as �howgE��}n fheae plane. The c= CONTRACTOR SHALL USE flElOfl1E CONNECTORS FROM THE TAW LLI
<br /> contractor s all ascertain t e true vartl and horizontal location 19 CONNECT NEW 2" SINGLE WALL FIBERGLASS VENT PIPING FROM SUMP TO THE VAPOR RECOVERY MANIFOLD. MAN PRODUCT LINES
<br /> and size of those to be ed of any u rground utiliftea and TANK FIELD TO EXISTING VENT PIPING. AND SIPHON PIPING SHAD PROVIDE AT LEAST FOUR (4) FEET OF
<br /> ahau size
<br /> re ponetble for ny damage to any public or iesprivaten SiRAKIHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF Q C G f
<br /> utilities, shown or not s own hereon.
<br /> IMPOR ANT NOTICE ©0 INSTALL NEW 4'x7', STEEL-FORMED, CONCRETE DISPENSER MORE THAN 30 OEGI:EEs. -1�+co 0 N u
<br /> /
<br /> Section 42t /4217 of ens Government code requires ISLAND, TYPICAL OF 4. REFERENCE DETAIL 1, SHEET CAI-1. O MODIFY TANK SUMP TO PROVIDE WATERTIGHT TESTING AND e C IC
<br /> a DI Alert dentifka.on Number be issued before a SECONDARY CONTAINMENT TESTING TO COMPLY WITH SB 969 `� �' '^
<br /> I Permit le donate will be valid. For your Dig Alert 21 PROVIDE AND INSTALL NEW CONDUITS FOR UNDER DISPENSER = � �Y
<br /> ID Numb call CONTAINMENT SENSORS TO NEW VEEDER ROOT TLS-350 MONITOR REQUIREMENTS. REMOVE AND OR REPLACE PIPING BOOT FITTINGS 5 AS NEEDED. TYPICAL OF 8 SUMPS. j5
<br /> •GO (0
<br /> UNDE GROUND SERVICE ALERT O5 - 0 W
<br /> -800-227-2600770
<br /> For• n _�derground Locating. 2 working days before you dig. — — — — — — — — - �� � © NOT USED O CONSTRUCT NEW CONCRETE SLAB OVER TANKS AS REQUIRED BY O Q T
<br /> ® \ NEW WORK. SET MANHOLE COVERS i-1/2" ABOVE SLAB. SEE I
<br /> PROTECT EXISTING OBSERVATION/INSPECTION WELL IN PLACE AS DETAIL SHEET M3-5. • CO
<br /> \ \ SHOWN.
<br /> .` O3 PER 0
<br /> INSTALL 3" SINGLE WALL, STAGE II VAPOR RECOVERY HEADER N
<br /> TOTAL AREA = 1 ,923 S.F. \\\ ,\ ® REUSE EXISTING 2"0 TANK VENT LINES. SLOPE 1/8" PER FOOT, FOOT FOR "BALANCE"
<br /> MINIMUM, TOPTANKSOR CSEERDETAILS ANDY SYSTEM. LSECTOPE IONS, SHEET C O
<br /> MINIMUM, BACK TO TANKS. O
<br /> TK3-3.
<br /> / I ® ❑ -•� O INSTALL© BUILDINGNEW EXTERORFILL ALARM AS SHOWN.AND ACKNOWLEDGMENT SWITCH ON ® INSTALL TWO. 2" DOUBLE WALL, PRODUCT LINES. LINES TO BE �+
<br /> C e.
<br /> EQUIPPED WITH LEAK MONITOR IN PIPING SUMP, ATTACHED TO (� L•i
<br /> INSTALL NEW EMERGENCY SHUT OFF SWITCH AT BUILDING TANK. LEAK MONITOR WIRED FOR TURBINE SHUT DOWN. SEE —Q
<br /> 0 0 o EXTERIOR. SURFACE MOUNT AT 42" ABOVE SIDEWALK SURFACE. DRAWING TK4-2 FOR WIRING DIAGRAM. SLOPE 1/8-INCH PERTO TANKS. "
<br /> VERIFY LOCATION WITH ARCO ENGINEER. FOOT,
<br /> MI IMUM, ARRANGEMENTEATETAIL TANK� PIPING0. ESHALL BEFOR
<br /> INSTALLED PER MANUFACTURERS RECOMMENDATIONS.
<br /> . 'I • O5 MODIFY EXISTING TANK RISER VENTS TO MANIFOLDED TO ONE PV
<br /> pp 19 CAP. SEE DETAIL 3 SHEET TK3-1. REMOVE EXTRA VENT RISER.
<br /> SALES AREA INSTALL EXTRACTOR FITTING ASSEMBLY FOR VENT AND STAGE II
<br /> 1 III ( 0 .. VAPOR RECOVERY. SEE SHEET TK-2 AND TK3-1.
<br /> SEE DRAWING TK4-2 FOR MONITORING CONDUIT DETAILS.
<br /> ® BACKFILL AND COMPACT TANK EXCAVATION IN ACCORDANCE WITH
<br /> ,o ARCO SPECIFICATIONS. PATCH AND/OR REPLACE A.C. PAVING TO
<br /> r. O .I ` MATCH EXISTING. O
<br /> %_ 1
<br /> O -
<br /> ' DISPENSERS, TO BERFETTED WITH WITH BALANCER
<br /> �� INSTALL FOUR (4) W
<br /> MULTI PRODUCT DIS
<br /> UNDER
<br /> ,•.,,, : : . : .,:. 6 ::;.��. -. '
<br /> DISPENSER CONTANMENTcd
<br /> STAGE 11 HOSES AND 2NCLUDINGAPRODUCTVAND VAPOR SHEAR
<br /> - -
<br /> . ' T2' ""' `,..` ... "'• •.: :..;• '..` ::. - � I, . .�: ; "...; ' �/ VALVES AND 3M INTERCOM. SEE DRAWINGS TK3 3 AND TK3 4
<br /> 3 FOR TYPICAL INSTALLATION DETAILS SEE DRAWING TK4 1 FOR
<br /> DISPENSER WIRING DIAGRAM. START UP BY MANUFACTURER'S
<br /> OREPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH MINIMUMO
<br /> O 8792 - - .. TJ 200 GALLONS PER HOSE. ANY AIR POCKETS OR START—UP
<br /> 11 &17PIPING LEGEND PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT
<br /> o ON
<br /> EJ ° I .. THETO
<br /> WRINCON A CONTRACTOR. NOTET DESTROYS ETHATR PING TOLTHE DISPENSERS BE BILLED MUST
<br /> .. �' o ! Y L.I`. ,�. ALWAYS BEINSTALLEDTO THE PB"NSIDELOF THE DISPENSER TO
<br /> .o .. . .�, ' ® tf i ,... gam_ 2" F.G. DOUBLE WALL
<br /> �. O
<br /> EJ I 1'• "" PRODUCT PIPING ENSURE PROPER MOUNTING TO THE UNDER DISPENSER
<br /> C
<br /> : I 2110 9 O -- CONTAINMENT SUMP. •^
<br /> I',. . - O
<br /> - ----- . SINGLE
<br /> -' 7' 22' 9' ':r ,. .. .. —3"VR— 2„ OR 3" F.G
<br /> WALL VAPOR RECOVERY 10 INSTALL DISPENSER SUMP MONITORS, TYPICAL OF 4. �
<br /> 20
<br /> _ 38' I. ' j. `. :• :' : +` PIPING 11 INSTALL NEW ISLAND BUMPER POST, TYPICAL OF 4. SEE DETAIL N C
<br /> ,j CO ® SP 1 ®- O — — — — 2" F.G. SINGLE WALL O LTf
<br /> Cvl 15 \/' VENT PIPING 6, SHEET CA1-1. '�
<br /> • I ACANOPY '�• :, .. —G— — — — EXISTING UNDERGROUND 12 CONTRACTOR SHALL CONSTRUCT NEW 6" THICK CONCRETE SLAB C m
<br /> zs'-sex 63' 16 i UTILITIES (WATER, GAS) WITH $3 REBAR AT 18" O.C., EACH WAY, OVER 4" AGGREGATE O
<br /> v 'i ... . .. . �. ...... ..' BASE
<br /> .. I --- -- - --
<br /> • ... .. .. ---3'�e7 -- -- - --- S7 NEW CONCRETE
<br /> 0 ao
<br /> .. .. i o
<br /> g2 i:i ..:...:i:: ........ .. .. ( : 13 NOT USED
<br /> r+ U
<br /> o EJ . . ...... ......... ....._.. ... NEW A.C. PAVING +-'
<br /> .... .. .. .... .. ...... ..................
<br /> . a o O 14 CONTRACTOR SHALL PROVIDE PERFORMANCE INSPECTION OF E>, v
<br /> EJ 4 EXISTING TANK TURBINES AND EVALUATE REPLACEMENT OR C Q iC
<br /> .7,. 2?. 2 . , .9'::,. ,.. ::: UPGRADE WITH ARCO ENGINEER. 0
<br /> TANK ELEVATION : U i2
<br /> Vi .12
<br /> e'.,.:'..:: .., . .. Q Ln >: O
<br /> EXISTING. Cd
<br /> (n
<br /> tQ�
<br /> N N 6
<br /> Y
<br /> Zt�y Vrrn X (i
<br /> � kV > U y
<br /> P.L. = 250.00' N
<br /> Q c_ Cow
<br /> M M
<br /> jN ON r0
<br /> you^^2�2
<br /> r2p a) can
<br /> F V Kv
<br /> mos er release date
<br /> NO. DATE REVISIONS PROJECT RELEASE proj. exe. drown by
<br /> 11/08/01 DBS
<br /> PERMIT
<br /> GRAPHIC SCALE project / facility
<br /> BID 6100
<br /> t0 9 5 1
<br /> CONST. sheet / file
<br /> ( IN FEET) TK-1
<br /> I inch a 10 feet
<br /> AS—BUILT of
<br /> ARCO/AR1402/TK-1.DWG