Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: Check this box if tank gaoang is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ No' <br />Y <br />❑ <br />No' <br />Was accuracy of system product level readings tested?yes <br />E0Des <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />MAR 19 <br />® <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />In Section H, below, describe how and when these aencienmes were or wni oe correcmu. <br />.ine Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />LL <br />TAl <br />WIT A. -TV nr_onor�,rr_u— <br />® Yes <br />101 No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; [30.2 g.ph. <br />® Yes <br />❑ No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No' <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />For electronic LLDs, aces the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />For elecbonic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or cam oe comecreo. <br />H. comments: PLLDS PASSED <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />