Laserfiche WebLink
A V Jy ED <br />Monitoring System CertificationRF'A <br />UST Monitoring Site Plan <br />Site Address: PERSHING GAS 4445 NORTH PERSHIWG AVENUE STOCKTON CA 95207 <br />JAN 2 2 201 <br />Rosemarie ENVIRONMENTEALTH <br />. . . . . . . . . . . .. . . . . . . �Jl.e,ni• <br />KEY <br />A = ANNULAR <br />F=FILLS (ARROWS) . . <br />T = TURBINE Drawing of piping exit <br />P — PROBE of sump and UDC's. . . . . . . . . . . . <br />V= VAPOR No underground . . . . . <br />X =SUMP SENSOR drawing is accurate, we <br />STP <br />L = LD cannot speculate blue DIE. F OG) LX <br />...... <br />M = Manway prints. <br />B = Brine Sensor (S� <br />1= Smart Sensor y [j <br />5T• <br />S=STP SUP. FQ <br />4 L a <br />C = Floats & Chains <br />E — E Stop <br />RUL_ OCCR � /� sTP <br />�LX <br />PIPING " <br />Date map was drawn: 2-6-17 <br />Instructions <br />S <br />7 <br />4 <br />9 <br />3 <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 <br />