Laserfiche WebLink
Dynamic Back Pressure Test <br /> Afforda-TeSt <br /> 416 2nd Street TP 201.4 <br /> Galt, Ca. 95632 ❑ <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 7/26/18 TIME: LOAM UST ® AST ❑ <br /> SITE NAME: PERSHING GAS ED STEARNS ❑ PT ❑ Startup Test ® Compliance Test <br /> Address:4445 N PERSHING AGENCY: <br /> I declare, under penalty of perjury under the laws of the state <br /> City: STOCKTON,CA 95207 of California that based on information and belief formed Inspector:LISA <br /> after reasonable inquiry, the statements and information <br /> Phone: provided in the document are true, accurate,and complete. <br /> TECH SIGNATURE: Present X Not Present <br /> Contact: <br /> Confirmation# 18-25651 <br /> Permit or Facility#N-633 <br /> #DISPENSERS 3 DISPENSER Make: GILBARCO NOZZLE Make: VST PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 6 Model: Model: Model:5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type: <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 91 ALL Initial pressure before testing-0 "we <br /> #Nozzles per Tank 6 6 6 <br /> EQUIPMENT <br /> Actual Tank Capacity 11627 11627 23254 Decay: x Blockage: x <br /> Gasoline Volume 3287 1419 4706 <br /> Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) 8340 10208 18548 <br /> Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial E V R EVR <br /> Digital Manometer ® I Digital Manometer ❑ <br /> Initial Test Pressure(Inches water)210 2,0 Equipment Calibration Date: 7/2/18 <br /> 1.99 Drift Check End Value: 0 PASS <br /> PSI 1 Minute(Inches water) Nitrogen Intro.Point: PHASE I <br /> PSI @ 2 Minutes1.99 <br /> PSI @ 3 Minutes e- C =) 1 98 Allowable Fill Time 2 scfm 12.18 <br /> Time 1:5.23 <br /> PSI @ 4 Minutes 0 1.97 <br /> "h e <br /> Final Pressure @ 5 Minutes(inches water) 1.96 Time 2: `� y <br /> or <br /> Allowable Final Pressure(CARB) i� 1.91 Time 3: <br /> I— ---- Liquid Removal Che, namic ck <br /> Z Pressure(if due),VadVarts <br /> ------- ------- —1 ------- PASS Repairs Are Liste a e 2N <br />