My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:22:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4445\PR0231785\INSTALL\1990 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�✓ _6. Overfill Protection System (spill catchment basin(s) required) <br />A. Nonmotor vehicle fuels (See Option IA) <br />1. Level sensing device and /2 or #'3 below <br />Audible/visual alarm triggered to liquid level sensor <br />Automatic shut-off device 04Y - <br />B. or vehicle fuels only <br />1, �nual monitoring <br />vCa. Written filling procedure provided( <br />Procedure addresses all of the following: <br />1) Visual monitoring of fuel level and filling operation <br />2) Available capacity of tank is at 103% or +200 gallons <br />(2635- 9) (A)(B)(C)) <br />3) Metered input <br />C. Spill catchment basin size <br />1. Minimum 5 gallons <br />XA O. Secondary containers (Includes leak interception and detection systems). <br />A. Backfill in secondary container -(:Article 3, Section 2635) <br />1. See Article 3 Section 2635(c) (1-8). <br />B. Two or more primary containers within secondary container (Demonstrate <br />product compatibilities). <br />C. Liquids detected in secondary containment must be sampled and analyzed for <br />hazardous substances. (Article 3, Section 2635(6) and Health and Safety <br />Code 25291(e)(h). <br />D. Water tight cover for secondary container excavation (Article 3, Section <br />2635(7)). <br />W/_11. Piping <br />A. Double containment required for:. <br />1. Product and vapor recovery lines. Uvt��cinrn� <br />2. Vent line (excluded only if ball float valve is installed). <br />
The URL can be used to link to this page
Your browser does not support the video tag.