Laserfiche WebLink
�NELU �Q4( \HAZMAT\MANULMON. ITR <br />OVERFILL PROTECTION SYSTEM <br />MANUAL MONITORING <br />Written Filling Procedure: <br />I. VISUAL MONITORING <br />Prior to delivery of fuels, a visual monitoring of the <br />liquid level of the tank to be filled shall be <br />performed. <br />The station operator shall control the visual <br />monitoring and filling of the tanks. <br />II. AVAILABLE TANK CAPACITY <br />The tank to be filled shall have an available capacity <br />of 103% of the load to be dropped into it or the total <br />load plus 200 gallon capacity, whichever is less, as <br />determined by storage tank visual monitoring. <br />III. METERED INPUT <br />The load to be dropped into the underground tank shall <br />be monitored either offsite by the batch plant into the <br />truck or onsite via a meter on the truck into the <br />underground tank. <br />Signature: Operator <br />Owner <br />