Laserfiche WebLink
I <br /> f <br /> o l loll <br /> TYPICAL FLAG NOTESa. <br /> FASCIA TYPE o <br /> 6" CONCRETE SLAB WITH #3 /J SEE SHEET SP4 FOR DETAILS ON DOWN- Z .' <br /> Q REINFORCING BARS 0 18" O.C. CANOPY COLUMN ( CITGO BRONZE ). ILS SPOUT FROM CANOPY ( INSIDE THE COLUMN ). A. TRI- STRIPE ( NON-ILLUMINATED ) W/ SIGN < � :e <br /> CANS FOR LOGOS. ( SEE SIGNAGE DRAWING: -J <+ <br /> BOTH WAYS. ( VERIFY PER LOCAL 2 �} <br /> SG-1, FOR STRIPE CONFIGURATION, <br /> ORDINANCES AND SOIL CONDITIONS ). q INTERCOM CALL BOX. MECHANICALLY COLOR, PLACEMENT, & RELATED DETAILS. O <br /> h\ MOUNT <br /> FASTENED TO COLUMN FACING THE MPD. ,�^\ OVERFLOW PROTECTION AS REQUIRED. <br /> Q 3 - #3 X 5'-0" ® 45' TO MAT, MOUNT AT 5'-0" ABOVE SLAB <br /> /I �\ SEE CANOPY DRAWINGS & SPECIFICATIONS. 0 <br /> 2 TYPICAL AT EACH CORNER W <br /> MERCHANDISE SPANDREL (2' x 6') F=ZL - <br /> ( PER NAT. GASOLINE <br /> Q GASOLINE CANOPY, SEE MANUFAC- r� <br /> J. TURER'S DRAWINGS & SPECIFICATIONS p6 <br /> 70P OF CONCRETE PAVING ( SEE NOTE: REFER TO SITE PLAN FOR VENT C� <br /> FOR DETAILS OF CONSTRUCTION. LINE LOCATION. VENT LOCATION <br /> 3 SPECIFICATIONS FOR FINISHING SLAB g WASH BUCKET <br /> SURFACE AND RELATED DETAILS ). ! CANOPY FASCIA MAY VARY FROM THIS PLAN. SITE ., <br /> PLAN TAKES PRECEDENCE <br /> METAL "DOGGONE" ISLAND FORM A OFE <br /> EVENT PIPESITE S. INTERIOR LOCATION THE <br /> ( B'-0" X 4'-0" ). FORM IS !O BE CANOPY COLUMN ILLUMINATED SIGN CAN LOCATION <br /> Q SET 3"3" BELOW TOP OF FINISHED CONC. LOCATION IS AN ALTERNATIVE. Q ( SEE SIGNAGE DRAWING: GR-1 <br /> SLAB. ( ISLAND FORM CITGO BRONZE ). Q FOR GUIDELINES ON THE PLACE- <br /> CANOPY LIGHT FIXTURE ( STD. 40OW S.M.N. ). MENT OF THE LOGO OR SIGN CAN ), <br /> WHITEWAY MODEL NO. RA-HPO-400-SMH. <br /> QMULTI-PRODUCT DISPENSER { MPD ). ROCK TRASH CAN SUPPLIED BY SOUTHLAND <br /> QLINE OF CANOPY ABOVE. A INSTALLED BY GAS CONTRACTOR. <br /> i -PER ISLAND <br /> 1-0 1 1 <br /> ° <br /> O O <br /> I z <br /> a g <br /> w <br /> J <br /> W <br /> m 6 <br /> d0 <br /> d w <br /> co 'o <br /> 15, <br /> a " � O <br /> o NdO hb� �P�4i <br /> It w <br /> M7 <br /> Z <br /> - > a <br /> n <br /> a i <br /> z O <br /> M <br /> U oi a <br /> CANOPY - SIDE ELEVATION 1 /4" = 1 '-0" 26'-0" CONCRETE PAD ? a o 2 <br /> 1 8 '- 0" 1 6'-0" 1 8'-0" 1 > Z ..j <br /> O <br /> w 0 p w <br /> n fir a <br /> - - - - - - i -- - - - 2 <br /> 10 <br /> I <br /> 1 TYPICAL <br /> OF EIGHT6 4 I 1 <br /> 0 5 <br /> 0 <br /> I — Y <br /> U a <br /> O O [ O o — <br /> UI U <br /> 6 o SIDE "A" 8 7 SIDE °B" b o STORE FRONT <br /> a w <br /> " 1 9 <br /> 000 _z9 <br /> mIN, DATE: <br /> 1 2 3 1 � <br /> ROCK a 3 — � - - 1 - - - - - - ' - - - - -{ — 07AUG97 <br /> TRASH PROJECT NOS <br /> CAN6"t'- 3010.20 <br /> " I I I <br /> DRAWN: MSP <br /> -o" s' <br /> 24'-0" CANOPY ABOVE APPROVED: DL <br /> CANOPY - FRONT ELEV. 1 /4" = 1 '-0" PLAN - 2 MPD ' S WITH 24 ' X 24 ' CANOPY 1 /4" = 1 '-10" DRAWING <br /> Gll <br />