Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />I <br />-- -"-----_�� ..I --••-••, ���•-••�� 19�.. ��.� r.l .�.. ulca <br />Yes <br />r <br />Ir <br />No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? (Check a// that <br />apply) Simulated leak rate: V 3 g.p.h.; 0.1 g.p.h; 1Az' 0.2 g.p.h. <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />Yes <br />No* <br />r <br />No* <br />ro <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />r <br />Yes <br />r <br />No* <br />Yes <br />Was accuracy of system product level readings tested? <br />r <br />Yes <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />r <br />No* <br />Was accuracy of system water level readings tested? <br />r <br />Yes <br />r <br />r <br />No* <br />No* <br />Were all probes reinstalled properly? <br />i` <br />Yes <br />i" <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* Tn <br />fhn <br />Cor+inn <br />Whnl...., <br />r4�Akl <br />L,.... <br />G uCiiI.ICIII.ICJ WCIC VI Wlil UC (:UT(CU.eU. <br />G. Line Leak Detectors (LLD): rCheck this box if LLDs are not installed. <br />Complete the following checklist: <br />i+ <br />_.. _.._ .., .,.,.,,.., ..w <br />r <br />N/A <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? (Check a// that <br />apply) Simulated leak rate: V 3 g.p.h.; 0.1 g.p.h; 1Az' 0.2 g.p.h. <br />G <br />Yes <br />r <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />ro <br />Yes <br />r <br />No* <br />Was the testing apparatus properly calibrated? <br />r# <br />Yes <br />r <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />r <br />Yes <br />r <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />I <br />N/A <br />r <br />Yes <br />r <br />No* <br />N/A <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />r <br />Yes <br />r <br />r <br />No* <br />N/A <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a test? <br />r <br />Yes <br />r <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />P <br />N/A <br />r'+ <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* Tn <br />thn Qnr+;nn <br />u <br />kfll ^I AN <br />A <br />Comments: <br />.. anu rvncn ulwc ucnucul.ICJ WCIC UI wm Ue correaea. <br />Page 3 of 3 12/07 <br />