Laserfiche WebLink
Comments: <br /> 1. T6 invalid fuel level,L2 Diesel piping sump south piping sump, L3 T1 sump fuel alarm(all in alarm mode) <br /> Items Requiring Follow-Up Actions: <br /> 1. T6 no action required. L2 and L3 sump alarms caused be rain. Site is in the process of removing the water at the time <br /> of this inspection. No further action required at this time. <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator,who possesses <br /> a current"California UST System Operator"certification issued by the International Code Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator,but not to <br /> the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the <br /> monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all attachments <br /> for the previous 12 months.The records must be maintained on-site or,if approved by the local agency,off-site <br /> at a readily available location. <br /> Page 1 of I November 2004 <br /> WO:2309346 <br />