My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
2300 - Underground Storage Tank Program
>
PR0231217
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 3:36:21 PM
Creation date
11/6/2018 10:36:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231217
PE
2361
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\4707\PR0231217\INSTALL 1988 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK. ?NSPECTION RECORD <br /> NEW TANK INSTALLATION <br /> SITE NAME / SAG J J• 8/ INSPECTOR'S NAME <br /> ADORESS CITY STG�KTON,��. ZI P.y .07 <br /> CONTRACTOR[ NAME TELEPHONE <br /> TELEPHONE <br /> OWNER[ NAME <br /> DIS- INSPECT'OR'S <br /> DATE APPROVED APPROVED INITIALS <br /> ITEM 00. EQUIPMENT INSPECTED <br /> INITIAI_I NSPECTION <br /> 1. Tank tested upon deliverY flinlidaylasteel) or air at SPSI 5FRfjj <br /> 2. Visual inspection of secondary containment. <br /> 3. Tank appropriately placed with approved backfill. <br /> 4. UL numbers and tank capacities recorded. <br /> PIPING STAGE INSPECTION <br /> r 1. Pressure test Of ilio Primar and Secondary (NFPA 3n <br /> 2. Ball float valves installed. <br /> 3. Overfill protection installed, describe: <br /> 4. Unused tank openings scaled and cathadicallY protected. <br /> 5. Visual inspection of secondary containment on i fn . <br /> (lock.bj. n..tMr Prop <br /> 6. i-ionitoring 221ts in place and btou hi to grade. cov.rs <br /> 7. Pill and vent If in hrou ha to rade. <br /> B. Product line leak detector in place. (Hard wired) <br /> 9. A roved tank leak monitoring device installed. <br /> 10. All &alvanlzed piping and fittings properly wrapped. <br /> (crP <br /> 1. Pressure ecu test on complete tank and product delivery System. <br /> 3001 <br /> j FINAI. 11;SPECTION p <br /> 1 I j l .- precision test succ essiull ••gym nleted .v:d hold c -.les ret clved.�p` <br /> E4. <br /> rotectioO at. fill 11 •. <br /> mance test .:1 nacrf i ll oat alt ion ::vste.. - <br /> aure test .�f iodari Ino• Icak dctecurt. (Hard wired)wanc a• Ira Of a^al inwu: m moil ni 1111S' sI (s) on tank(s) �inu to oxrate a D"c'ouable recordkee in s st cw. <br /> Co"Wr-': <br />
The URL can be used to link to this page
Your browser does not support the video tag.