My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
2300 - Underground Storage Tank Program
>
PR0231217
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 3:36:21 PM
Creation date
11/6/2018 10:36:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231217
PE
2361
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\4707\PR0231217\INSTALL 1988 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. <br /> Name of Supplier,Owner or Dealer Address No.and Street is) city State Date of Test <br /> 15. TANK TO TEST 15a. BHJEF DIAGRAM OF TANK FIELD 16. CAPACITY From <br /> ,, Station Chart <br /> Nominal Capacity D®� ❑ Tank Manufacturer's Chart <br /> Identity by Pon ion Gallons TT��II <br /> L� I / L l Company Engineering Data <br /> _ V � Charts supplied with <br /> Brand and Grade By most accurate <br /> Capacity chart available /OC7 <br /> ❑ Other <br /> Gallons <br /> 17. FILL-UP FOR TEST Total Gallons <br /> Gallons ea.Reading <br /> Stick orBottom f.✓� f.b 6+' f .✓ <br /> beforee Fill-up <br /> Fill-up C� - in. `T(,� yam` <br /> Inventory <br /> to W, Gallons rA <br /> Tank Diameter <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑Water in tank ❑ Llnefs)being tested with LVLLT <br /> See manual sections applicable Check below and record procedure in fog(27). ❑High water table in tank excavation <br /> iUse maximum allowable test pressure for all tests. 19TANK MEASUREMENTS FOR Transfer total to line 25a. <br /> Four pound rule does not apply to dou blew .alled tanks. TETT ASSEMBLY _ <br /> Complete section below. <br /> LTL 21. VAPOR RECOVERY SYSTEM ❑Stage l ❑Stage II <br /> Bottom of tank to grade' ............................ In. <br /> Add 30"for'"F"probe easy........................... - in. 241). COEFFICIENT OF EXPANSION <br /> 1. Is four pound rule required? Yes ElNo IV/ �` %,y <br /> Totat tubing to assemble—approximate ._ ____ _.... in. RECIPROCAL METHOD r�,.s,+�✓i1 <br /> 2Height to i2"mark from bottom of tank in. 20. EXTENSION HOSE SETTING j Type of Product ........................................ <br /> . <br /> Tank top to grade'.................................. in. Hydrometer Employed .................................. <br /> Extend hose on suction tube 6"or more Temperature in Tank <br /> 3. Pressure at bottom of tank P.S.I. After Circulation........................................ <br /> below tank tap......................................�#n. <br /> Temperature of Sample................................. <br /> 'If Fill pipe extends above grade,use top of fill. , <br /> 4. Pressure at tap at tank P.S.I. <br /> 22. Thermal-Sensor reading after circulation Difference(+!-)......................................... <br /> df <br /> Depth of burial in. °F Observed A.P.I.Gravity ................................. <br /> 23. Digits per'F in range of expected Change Reciprocal Page# t/J` <br /> Tank din. in. <br /> digits <br /> COEFFICIENT OF EXPANSION (Complete after circulation) <br /> 24a. Corrected A.P.I.Gravity Total quantity in Reciprocal Volume change in <br /> Water table in. full tank(16 or 17) this tank per°F <br /> NOTES' <br /> Observed A.P.I.Gravity................................... Transfer to Line 26a. <br /> Hydrometer employed.........._........................ H <br /> S <br /> Observed Sample Temperature ......................... °F 24c. FOR TESTING WITH WATER ee Table C s D <br /> Corrected A-P.I.Gravity <br /> Water Temperature sitar Circulation <br /> (u?60°F.From Table A.................................... Table -.... °F' <br /> Coefficient of Expansion Coefficient of Water <br /> The above calculations are to be used for dry soil conditions to for Involved Product Tabfe D"................................... <br /> From Table B......................... ...,....... <br /> establish a positive pressure advantage,or when using the lour pound ������•��••-��•• <br /> rule to compensate for the presence of subsurface water in the tank Transfer COE to Line 25b. Added Surfactant? ❑Yes ❑No Transfer COE to Line 25b. <br /> area. <br /> Rotor to N.F.P.A. 30, Sections 2-3.2.4 and 2-7.2 and the tank 25, a) X (b = (e) <br /> gallons <br /> manufacturer regarding allowable system test pressures. Total quantity in GoelRcient of expansion for Volume change In this tank. <br /> full tan (1 f6 or 17)�y't�. ` invol d product per°F <br /> 26. (a) .! This is <br /> Volume change per"F(25 or 24b) Digits per°F#n test Volume change per digit test <br /> Range{23) Compute to 4 decimal places. factor(a) <br />
The URL can be used to link to this page
Your browser does not support the video tag.